Laserfiche WebLink
REVISIONS <br /> GENERAL NOTES <br /> 1. PROVIDE COPPER EQUIPMENT GROUNDING CONDUCTOR, SIZED <br /> PER N.E.C. 250, IN ALL CONDUITS WITH CIRCUIT CONDUCTORS. <br /> 2. ALL VISIBLE CONDUITS ARE TO BE PAINTED TO MATCH <br /> SURROUNDING FINISHES BY OTHERS. <br /> ARCH.PROJECT NO. <br /> TES <br /> KEYED NO wnv103sD AWN <br /> JF <br /> 1. ELECTRICAL CONTRACTOR TO RUN WIRING TO PANEL `LH(SEC. 2)' CHECKED <br /> FOR CASE FANS, LIGHTS AND ANTI-SWEAT CIRCUITS. ELECTRICAL WBC <br /> CONTRACTOR TO MAKE ALL TERMINATIONS. SUBMITTAL DATES <br /> 2. CONTRACTOR TO TERMINATE CONTROL WIRES AT SOLENOID ON TBD <br /> CASE. OTB DATE <br /> TBD <br /> 3. TERMINATE DEFROST CONDUCTORS ON REMOTE MECHANICAL <br /> TIMECLOCK LOCATED AT CASE. <br /> 4. PROVIDE 3/4"CONDUIT TO RACK B FOR 208V VALVES. RE: R4 FOR w o Q o o o <br /> CONTROL WIRE TERMINATION LOCATIONS. FOLLOW POWER o A 10--loz F o o 0 <br /> 2 CONDUIT ROUTING FROM CASE TO ROOF STRUCTURE. °H o o w ¢p ti 'z"o <br /> �rWapz %,4z3Q <br /> E z <br /> x <br /> 5. PROVIDE 3/4"C WITH CALIBRATED PULL TAPE TO VOID ABOVE Q w x ' a w v <br /> CEILING OR TO BOTTOM OF ROOF STRUCTURE FOR CONTROL w a Q o U m� <br /> WIRING. FOLLOW POWER CONDUIT ROUTING FROM CASE TO ROOF °3 C a c E o Q o o a a N o <br /> i STRUCTURE. 0 � LO <br /> M > <br /> N c = .cn <br /> � � `N! LO U com <br /> CV 0 CO 00 cD a� <br /> z <br /> ch G N E Q <br /> 6 ,25 IN 8 N <br /> m a.•►- <br /> C.0 <br /> rn <br /> U <br /> c <br /> -- --- ELECTRICAL DEVICES 1- <br /> i o JUNCTION BOX <br /> 0D•2 - " ith 3 2) PANELBOARD p(�FESS! <br /> v 3/4 C w <br /> Q <br /> 2#12-LH-68,70- DEFROST <br /> 10 r` 1#12G 1 O KEY NOTE =P m <br /> I J J 3/4"C with <br /> 2#12-LH-66 -FANS/LIGHTS <br /> oc 181 <br /> 5 KEY NOTE AREA P:9 <br /> 1#12G <br /> 3/4"C with 2 4 <br /> 6#14 CONTROL F �Q <br /> T <br /> REFRIGERATION CASE CONNECTION CALLOUT Xxaxx/Xx <br /> I � <br /> O -1!!� <br /> d- <br /> PANELBOARD SCHEDULE <br /> PANEL: LH-2 <br /> W � M <br /> []- <br /> VOLTAGE: 208/120V PHASE: 3 WIRE: 4 AMPERE RATING: 200A SC RATING: 5,823 MAIN: MAIN LUGENTRY: MOUNTING: FLUSH <br /> LOADS: mpg VA LOAD TYPES: 1 =LIGHTINGREMARKS:fr + + + + <br /> �+ + + + + PHASE A: 9 1134 2=RECEPTACLES (N)INDICATES NEW BREAKER IN EXISTING PANEL <br /> + + + + + + I '^ v <br /> +++++++ <br /> + + + + PHASE B: 9 1134 3=MISC <br /> ++++++++++++ PHASE C: 6 684 4=MOTOR <br /> ++++++++++++ TOTAL: 2952 5=KITCHEN <br /> + + + + I I LOAp LOAD AMPS/ CKT CKT AMPS/ LOAD LOAD <br /> � (VA) LOAD SERVED NOTE TYPE. POLES NO PHASE NO POLES TYPE NOTE LOAD SERVED (VA) U <br /> RACK OVEN CONTROLS 20 1 43 A 42 20 1 1 DIVIDER <br /> -- -- PROOFER CONTROLS <br /> — ___ 20 1 45 B 44 20 1 -- <br /> - - 20 1 47 C 46 20 1 --- <br /> __ SHEETER/CUTTER � N <br /> DONUT INJECTOR 20 1 49 A 48 20 1 ICE MERCHANDISER <br /> MCROWAVE OVEN 20 1 51 B 50 20 1 ICE MERCHANDISER <br /> -- - WATER METER 20 1 53 C 52 20 1 8, 11 <br /> SPARE 20 1 55 A 54 20 1 1 EF-1 <br /> SPARE 20 1 57 B 56 20 1 ICE MERCHANDISER <br /> - � SPARE 20 1 59 C 60 20 1 SPARE <br /> SYS B2B FANS/LIGHTS 15 1 1 61 A 62 20 1 SPARE <br /> -Fri <br /> SYS B2C FANS/LIGHTS 15 1 63 B 64 20 1 1 SPARE <br /> =-= SYS B26 CASE DEFROST 25 2 65 C 66 20 1 3 SYS B10 FANS/AS/LIGHTS 684 <br /> C (N)SYS B10 DEFROST <br /> (E)PANEL LH(SEC _ ____- �� 67 A 68 15 2 31134 <br /> SYS B2C CASE DEFROST 25 2 69B 70 3 1134 <br /> (E) PANEL'LH(SEC 12)v <br /> - - <br /> 71 C 72SPACE <br /> SPARE 25 2 1 73 A 74 SPACE <br /> - - <br /> �� -- 75 B 76 SPACE <br /> { 77 C 78 SPACE <br /> SPACE <br /> ISI' I,' 79 A 80 <br /> ( SPACE <br /> l 81 B 82 SPACE <br /> ISN ilk;' 83 C 84 1 SPACE <br /> 2 <br /> SHEET TITLE <br /> PARTIAL FLOOR PLAN PARTIAL <br /> 1 1/8" = 1'-0" z <br /> EFRIGERATION <br /> PLAN <br /> MNWA SHEET <br /> v� M0 BMW <br /> d; <br /> M DC ENGINEERING <br /> Careful listening.Dynamic solutions. 2 <br /> WWW. cengineerirmnet <br /> Phone:208.288.2181 Project:l8TAf01-AS17 <br /> 00 <br /> N <br /> 00 <br />