Laserfiche WebLink
REVISIONS <br /> 1 2 <br /> GENERAL NOTES ARCH.PROJECT NO. <br /> WIN103B <br /> DRAWN <br /> JR <br /> 1. THE REFRIGERATION CONTRACTOR SHALL INVESTIGATE AND ENSURE CHECKED <br /> COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL CODES PRIOR TO MC <br /> INSTALLATION. THE ENTIRE INSTALLATION SHALL BE IN ACCORDANCE SUBMITTAL DATES <br /> WITH ALL APPLICABLE CODES. 08/01/18 <br /> 2. UPON COMPLETION OF INSTALLATION, REFRIGERATION CONTRACTOR OTB DATE <br /> TO ENSURE ALTERED PROTOCOL UNITS ARE PROPERLY CHARGED WITH TBD <br /> 4 14 REFRIGERANT. W <br /> 3. COMPLY WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS q 5 w w a o <br /> V <br /> REGARDING REFRIGERANT RECLAIMING, SYSTEM EVACUATION, w o H Q o o o <br /> EQUIPMENT, OIL AND REFRIGERANT DISPOSAL. z o° z o o x z <br /> 4. COMPLETE THE APPROPRIATE WINCO FOODS REFRIGERANT TRACKING 3 H a o o Q a a �' F o <br /> FORMS AND PROVIDE DOCUMENTATION THAT ALL OTHER w � aovw � <br /> REGULATIONS HAVE BEEN COMPLIED WITH. w I x x Q o - Q Q o� �' <br /> ti <br /> 0004 <br /> Nh > � � <br /> KEYED NOTES N o 0 0 co <br /> M <br /> ti �j t U <br /> 1. REFRIGERATION CONTRACTOR TO DEMOLISH FIXTURE. CD <br /> Z Moo m <br /> COORDINATE DISPOSAL WITH OWNER AND COMPLY WITH ALL a) o N E I <br /> REFRIGERANT TRACKING SPECIFICATIONS. 0 ,0 <br /> m aCU J <br /> (D 22> — — — — — \ — — — — — — — — — — 2) <br /> H CD <br /> T <br /> 9 ESS/pN <br /> H.M114 ql� <br /> y NO. 31885 z <br /> ca m <br /> LU m <br /> d � <br /> s��FcNANIGP��`P <br /> FOFrm-\Fo08/01/18 <br /> � n <br /> (C g} — _- — — — — — — — El <br /> 0 <br /> o > <br /> U U <br /> + + + + + + <br /> + + + + + + <br /> + + + + + + <br /> -- ----------- --- PARTIAL REFRIGERATION DEMO PLAN <br /> 3/16" = F-0" z <br /> 1 2 <br /> SHEET TITLE <br /> EFRIGERATION <br /> DEMO PLAN <br /> 00 SHEET <br /> mii BMW <br /> cV DC ENGINEERING <br /> 00 Careful listening.Dynamic solutions. RO <br /> w wvi.dcenaineerinq.n et <br /> NPhone:208.288.2181 Project:1 8TA101-AS1 7 <br /> 00 <br />