My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1999 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
3/21/2019 1:29:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2000
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
071/27%99 10:29 FAX 425 251 8-52 B.�RGHAUSEN X1008/008 <br /> Cdldornle Edition:Sel;WM pr 1997 <br /> Marley Pump Co. <br /> Red Jacket PPM 4000, RLM 8o00, RLM 10000,ST 1401L,and ST1801L <br /> AUTOMATIC ELECTRONIC UNE LEAF:DETECTOR � <br /> Certification: Leak rate of 3.0 gph with PD�1000%and PFA %, i <br /> Leak Threshold: 2.0 gph. A leek is declared if the output of the measurement system <br /> equals or exceeds this threshold. <br /> Applicability: Gasoline, diesel, aviation fuel and solvents_ <br /> Specification: System tests pressurized fiberglass and steel pipelines. <br /> Tests are conducted at 5-10 psi. <br /> Pipeline Capacity: Maxlmum of 55.1 gallons. <br /> Waiting Time: None between delivery and testing_ <br /> None between dispensing and testing. <br /> Test Period- Response time is 1 minute. <br /> Test data are acquired and re=ded by a microprocessor. <br /> Calculations are automatically perfonred by the microprocessor_ <br /> System Features: Permanent installation on pipeline. <br /> Automatic testing of pipeline. <br /> Preset threshold. <br /> Single test to determine if pipeline is leaking. <br /> Recording and display of day,date, and time of positive test. <br /> Dispenser shutdown,message display,and alarm activation if leak is declared. <br /> Calibration; System must be checked annually end calibrated if necessary in accordance with <br /> manufacturers instructions. <br /> C %g A A-)16 /P R-1 <br /> Marley Pump Co. Evaluator. Ken Wilcox Associates <br /> 5800 Foxridge Dr. Tel: (616)443-2484 <br /> Mission, KS 66202 <br /> Tel: (913)813-5700 Date of Evaluation:03/11191, Rev. 04194 <br /> 157 <br /> Appeardnce on this list is not to be constn;ec as an eridcF.ement by any regulatory agency nor is it ary guarantee of the performance of <br /> the method or equipnenL Equipmrant s)w,d 5e installed and operated in accordance with all applicable lavas and regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.