My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1999 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
3/21/2019 1:29:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2000
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jun-28-99 11 : 39A ARCO PRODUCTS CO_ 916 684 6250 P _ 02 <br /> PROPOSED SCOPE OF WORK FOR EXPLORATORY EXCAVATION <br /> LOCATIONS <br /> FAC#595 6100 North Hwy 99, Stockton <br /> FAC #6080 85 East Louise Ave., Lathrop <br /> Scope of Work <br /> 1. Isolate area of construction from public access. <br /> 2. Remove impacted dispensers from service. <br /> 3. Breakout concrete in front of first pair of dispensers utilize existing joints in concrete (12" <br /> to 36" in width from face of dispenser island) <br /> 4. Remove concrete and hand excavate backfill over piping. <br /> 5. Expose product lines for inspection by County representative. If steel pipe and or fittings <br /> are uncovered, secure work and shut down fuel islands. If no steel components are <br /> found, repeat procedure for next pair of dispensers until all dispensers have been <br /> Checked. <br /> 6. Backfill and repair concrete as required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.