Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> Ully <br /> SAN JOAQUIN COUNTY <br /> �• <_.�.••oG Unit Supervisors <br /> Donna K.Heran,R.E.H.S. <br /> N I :� 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> Director Mike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> • o•. �P Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Q4c/FORA <br /> Laurie A.Cotulla,R.E.H.S. Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Program Manager Mark Barcellos,R.E.H.S. <br /> December 5, 2002 <br /> Arco Station <br /> Attn: Chris Moul <br /> 4 Centerpointe DR <br /> La Palma CA 90623 <br /> Re: Arco Station #595 6100 N HWY 99 Stockton CA 95205 <br /> A recent review of the underground storage tank (UST) file for the above referenced facility indicated <br /> that this office has not received your annual monitoring certification and line leak detector <br /> certification. According to Title 23, California Code of Regulations, Section 2637 (b), this testing <br /> must be performed at least once every 12 months. According to section 2636 (f)(4), you must submit <br /> your pressurized line tightness test to this office annually(unless exempt under section 2636 (g)). <br /> If these tests have not been performed in accordance with the required time frames, then schedule the <br /> monitoring certification, line leak detector certification, and pressurized line tightness test with a <br /> certified technician by January 5, 2003. <br /> At this time we would also like to remind you that secondary containment systems installed after <br /> January 1, 2001 shall be tested upon installation, six months after installation, and every thirty-six <br /> months thereafter. Secondary containment systems installed prior to January 1, 2001 shall be <br /> tested by January 1, 2003 and every thirty-six months thereafter (Section 2637 (a)). <br /> In addition, this office must be notified of the test date and time 48 hours prior to performing any of <br /> the above tests. Results from the above testing must be sent to this office within 30 days of the test <br /> completion. It is the responsibility of the owner/operator to have all test results submitted to <br /> this office by January 5, 2003. <br /> If you have any questions regarding this matter you may contact Dina Abate at(209) 468-3468. <br /> Thank you, <br /> Dina Abate <br /> Environmental Health Specialist <br />