Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> s• _� 0� Unit Supervisors <br /> Z.. ?, Donna K.Heran,R.E.H.S. Carl Borgman,R.E.H.S. <br /> Director 304 East Weber Avenue, Third Floor <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins, S.,R.D.I. <br /> Douglas W.Wilson, <br /> R.E.H.S. <br /> • c.. �v Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> q�iFp.Ria <br /> Laurie A.Cotulla,R.E.H.S. Robert McClellon,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 <br /> Mark Barcellos,R.E.H.S. <br /> December 5, 2002 <br /> Arco Station #595 <br /> 6100 N HWY 99 <br /> Stockton CA 95205 <br /> Re: Arco Station #595 6100 N HWY 99 Stockton CA 95205 <br /> A recent review of the underground storage tank (UST) file for the above referenced facility indicated <br /> that this office has not received your annual monitoring certification and line leak detector <br /> certification. According to Title 23, California Code of Regulations, Section 2637 (b), this testing <br /> must be performed at least once every 12 months. According to section 2636 (f)(4), you must submit <br /> your pressurized line tightness test to this office annually(unless exempt under section 2636 (g)). <br /> If these tests have not been performed in accordance with the required time frames, then schedule the <br /> monitoring certification, line leak detector certification, and pressurized line tightness test with a <br /> certified technician by January 5, 2003. <br /> At this time we would also like to remind you that secondary containment systems installed after <br /> January 1, 2001 shall be tested upon installation, six months after installation, and every thirty-six <br /> months thereafter. Secondary containment systems installed prior to January 1, 2001 shall be <br /> tested by January 1, 2003 and every thirty-six months thereafter (Section 2637 (a)). <br /> In addition, this office must be notified of the test date and time 48 hours prior to performing any of <br /> the above tests. Results from the above testing must be sent to this office within 30 days of the test <br /> completion. It is the responsibility of the owner/operator to have all test results submitted to <br /> this office by January 5, 2003. <br /> If you have any questions regarding this matter you may contact Dina Abate at (209) 468-3468. <br /> Thank you, <br /> &'4� <br /> Dina Abate <br /> Environmental Health Specialist <br />