Laserfiche WebLink
ENVIRO MENTAL HEALT#DEPARTMENT <br /> U " SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Q. ., Donna K.Reran,RE.H.S. 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> # Director <br /> l Mike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen R.E.H.S. Stockton California 95202-2708 <br /> �.J• Douglas W.Wilson,R.E.H.S. <br /> • c ��P Program Manager Telephone: (209)468-3420 Margaret Lagorio,R.E.H.S. <br /> i F o a Laurie A.Cotulla,R.E.H.S. P <br /> Program Manager Fax: (209)464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> October 22,2002 <br /> Petcon Technologies <br /> 14118 South Inglewood <br /> Hawthorne CA 90250 <br /> Re: Arco#595 <br /> 6100 N. Hwy 99, Stockton <br /> The permit application to expose the product lines for the exploration of a leak has been approved with <br /> the following conditions: <br /> I. A complete description of work performed must be submitted prior to scheduling the final <br /> inspection. <br /> 2. Contact the local fire department and San Joaquin Valley Air Pollution Control District for <br /> applicable permits. <br /> 3. If any piping or equipment is to be repaired/replaced Environmental Health Department(EHD) <br /> must be notified so that an inspection can be arranged and parts can be approved prior to <br /> commencing work.Per Environmental Health assessment of findings, new plans and a permit <br /> application may be required to be submitted. <br /> 4. All piping, fittings and connections shall bear a UL label and be compatible with the existing <br /> manufacturer. <br /> 5. All equipment in contact with backfill must be corrosion protected. <br /> 6. Soil sampling may be necessary per Environmental Health assessment. <br /> 7. EHD must witness a 30-minute pressure test primary and secondary piping of all <br /> repaired/replaced piping prior to backfill. <br /> 8. EHD must witness a 24-hour lake test on any sumps/dispenser pans that require repair or <br /> replacement. <br /> 9. A line integrity test on the primary piping of all exposed lines must be performed by a third party <br /> certified technician and results received by this office prior to the final inspection. <br /> 10. If concrete is broken near the underground storage tank a tank integrity test must be performed by <br /> a certified tank tester prior to the final inspection. <br /> 11. Arrange a final inspection with this office prior to finalizing the work complete.Give 48-hour <br /> notice for all inspection appointments. Contact Dennis Catanyag,REHS at(209)468-3459 for all <br /> inspection appointments. <br /> 12. This permit expires January 22,2003. <br /> If you have any questions you may call me at(209)468-9847. <br /> Thank you, <br /> Michelle Sterni Le,REHS <br /> Registered Environmental Health Specialist <br />