My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_2001 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
3/21/2019 1:31:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001 - 2016
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page -S of t' <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other f Specify) <br /> Test Method Used: ®Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution: 0 to 15"psi <br /> Piping Run# Piping Run#J 7-2 Piping Run# 471 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: <br /> Piping Diameter: - <br /> Length of Piping Run: <br /> Product Stored: S S 4 S <br /> Method and location of /% <br /> piping-run isolation: /c., �,,,sem.�+ i i j I <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: --/O n 0 %r. i S - ,o vs, <br /> - -_- <br /> Initial Reading(R): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 1060 ," " �/,� <br /> Final Reading(RF): --fes PSI e-,' PSI ,51 PSI PSI <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RO: N'-+ f4,/ PSI -` - PSI -.19- PSI PSI <br /> Pass/Fail Threshold or Zero Zero Zero Zero <br /> Criteria: <br /> COmments-(include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.