My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2000 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 2:39:12 PM
Creation date
3/26/2019 2:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2006
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> Site Address: 3212 N. CALIFORNIA Date of Testing/Service: 10/03/2006 <br /> PTO#N-79 <br /> F. In-Tank Gauging /SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> EYes ❑No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> X❑Yes ❑No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑No Was accuracy of system product level readings tested? <br /> Yes ❑No Was accuracy of system water level readings tested? <br /> Yes ❑No Were all probes reinstalled properly? <br /> X❑Yes [:]No Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑X Yes ❑No El N/A (Check all that apply)Simulated leak rate: Q 3 g.p.h❑0.1 g.p.h 00.2 g.p.h <br /> X Yes ❑No Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> M Yes F-]No Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No• ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Q Yes ❑No ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> M Yes ❑No ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> X❑Yes ❑No' ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> M Yes ❑No ❑N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ZYes ❑No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.