Laserfiche WebLink
4 <br />s <br />VNDERGROUN_ STORAGE TANK MONITORING SYSTElva CERTIFICATION <br />F. In -Tank Gauging / SIR Equipment: Permit Number: <br />❑ Check this box if tank gauging is used only for inventory control <br />❑ Check this box if no tank ga Laing or SIR equipment is installed <br />This section must be completed if in -t - gauging equipment is used to perform leak detection monitoring, <br />Comnlete the following checklist: <br />❑ Yes <br />❑ <br />No* <br />Has all input g been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ <br />No* <br />Were all tank gai6ing probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of s tem product level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of syste water level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Were all probes reinstalle roperly? <br />❑ Yes <br />❑ <br />No* <br />Were all items on the equipmen nufacturer's maintenance checklist completed? <br />r in bection ti neiow, a, -,scribe now ana wizen these ae)dEaisb <br />es were or will be corrected. <br />G. Dine beak detectors ��): ❑Check t if LLDs are not installed. <br />Comnlete the following checklist: <br />❑ Yes <br />Cl No* <br />For equipment start-up or annual equi ent certification, was a Leak simulated to verify LLD performance? <br />CD NIA <br />(Check all that apply) Simulated leak ate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h. ; ❑ 0.2 g.p.h. <br />❑ Yes <br />❑ No* <br />Were all LLDs confirmed oper 'onal and accurate within regulatoryzequirements? <br />❑ Yes <br />❑ No* <br />Was the testing apparatus p perly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLDs, d es the LLD restrict product flow if it detects a leak? <br />❑ N/A • <br />I <br />❑ Yes <br />❑ No* <br />For electronic LLDs, oes the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LI.Ds does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs,es the turbine automatically shut off if any portion of the monitoring system malfunctions <br />❑ NIA <br />or fails a test? <br />Yes <br />C3 No* <br />For electronic LLDs, have 1 accessible wiring connections been visually. inspected? <br />Lcl--Y:e:s <br />El NIA <br />C]No* <br />Were all items on the equipmen nufacturer's maintenance checklist completed? <br />In Section1i below, -describe. -how and when these den`s ncies were or will be corrected. <br />H. Comments: <br />DEMMV9301,(Rev 08/02). Page 3 of 4 County of San Diego -DEH -Hazardous Materials Division. <br />