Laserfiche WebLink
00 <br /> MGFrrlfe-RYAN INC. 6R Job# 20-641304.1 <br /> SWRCB,January 2002 Page 2 of 4 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer <br /> Other(specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: .5 PSI <br /> Piping Run# t Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith <br /> Piping Diameter: 3" <br /> Length of Piping Run: 10" <br /> Product Stored: 87 <br /> Method and location of Boot to Boot <br /> Piping-run isolation: 0 1ry <br /> Wait time between applying <br /> pressure/vacuum/water and I0min "°9P"is tt ItA <br /> starting test: <br /> Test Start Time: 1:00 <br /> Initial Reading(Ri): 5psi <br /> Test End Time: 2:00 <br /> Final Reading(Rf) 5psi <br /> Test duration: Ihr <br /> Change in Reading(Rf-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 0 U 0 0 <br /> Test Results: Pass Fail Pass Fail Pass Fail Pass Fail <br /> Comments-(include information on repairs made prior to testing, and recommend Jollow-up for failed tests) <br /> 1)87-1 to 87-2 siphon line. <br />