Laserfiche WebLink
00 <br /> �6m'LER-RYAN INC. .;,R Job# 20-641304.1 <br /> SWRCB,January 2002 Page 3 of 4 <br /> 6.PIPING SUMP TESTING <br /> Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer <br /> Other(specify) <br /> Test Method Used: Pressure Vacuum Hvdrostatic <br /> Other(specify) <br /> Test Equipment Used: Incon Equipment Resolution: 0.0001 <br /> Sump# 57-2 Sump# Sum # Sump# <br /> Sump Diameter: 42" <br /> Sump Depth: 71" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of L�. <br /> 30" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest - <br /> 30" SEP <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good <br /> Portion of Sump Tested(1) 2"Above Piping <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No NA Yes No NA Yes No NA Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe Yes No NA Yes No NA Yes No NA Yes No NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes No NA Yes No NA Yes No NA Yes No NA <br /> o erational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10min <br /> test: <br /> Test Start Time: 1:19 <br /> Initial Reading(Ri): 40923 <br /> Test End Time: 1:34 <br /> Final Reading(Ro 40922 <br /> Test duration: 15min <br /> Change in Reading(Rf-Ri): -0.0001 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Results: Pass Fail Pass Fail Pass Fail Pass Fail <br /> Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and Yes No NA Yes No NA Yes No NA Yes No NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing, and recommend follow-up for failed tests) <br /> (1)If the entire depth of the sump is not tested.specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested.(See SWRCB LG-160) <br />