Laserfiche WebLink
l <br /> SWRCB,January 2002 MAY 2 6 2015 Page_4_of—7- <br /> 6. PIPING SUMP TESTING ► >�s�"kno �L: " <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standar -` �' ` Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ® Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: INCON SUMP TESTER Equipment Resolution:+/-0.002" <br /> MINNIE$ <br /> Sump#87(1) Sump#87(2) Sump#91 Sump# <br /> Sump Diameter: 48" 48" 48" <br /> Sump Depth: 63" 65" 64" <br /> Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Height from Tank Top to Top of 27" 28" 20" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 16" 17" 22" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: DRY DRY DRY <br /> Portion of Sump Tested' ABOVE ABOVE ABOVE <br /> PENETRATIONS PENETRATIONS PENETRATIONS <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes [:]No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA Elves ❑No ❑NA <br /> -product and water)?' <br /> Turbine shutdown response time NIA N/A NIA <br /> Is system programmed for fail-safe ❑Yes [:]No ®NA ❑Yes [-]No ®NA ❑Yes [-]No ®NA ❑Yes [:]No ❑NA <br /> shutdown? <br /> ailf <br /> Was -safe verified to be <br /> o as ailnal?� ❑Yes ❑No ®NA Dyes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No [:INA <br /> - erWait time between applying <br /> pressure/vacuum/water and starting 10 MIN NOT TESTED 10 MIN <br /> test: <br /> Test Start Time: 12:26 12:26 <br /> Initial Reading(Rj): 6.3551" 5.5997" <br /> Test End Time: 12:41 12:41 <br /> Final Reading(RE): 6.3539" 5.5996" <br /> Test Duration: 15 MIN 15 MIN <br /> Change in Reading(RF-Rj): -0.0012" -0.00011, <br /> Pass/Fail Threshold or Criteria: +/-0.002" +1-0.00211 +/-0.002" +/-0.002" <br /> Test Result: ®Pass ❑Fail ❑ Pass ❑ Fail ® Pass ❑Fail ❑Pass ❑Fail <br /> Was sensor removed for testing? M Yes ❑No [:INA ❑Yes [:]No ®NA ®Yes ❑No [:INA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testin ? ®Yes [—]No ❑NA ❑Yes [:]No ®NA ®Yes ❑No [:INA ❑1'es ❑No ❑NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br /> 87(2)STP SUMP NOT TESTED;DUE TO 87(2)SYPHON FAILURE <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />