Laserfiche WebLink
MAY 2 6 2010 <br /> SWRCB,January 2002 Page _7 of_7 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXY,.`r <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> 'fest Method Used: ❑Pressure ❑ Vacuum ® Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:VISUAL Equipment Resolution: 1/16" <br /> Spill Box# Spill Box# pill Box# Spill Box � <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or NO LOSS NO LOSS NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: ❑ Pass ❑ Fail ❑Pass ❑ Fail ❑Pass ❑ Fail ❑Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br /> SPILL BOXES TO BE TESTED WITH ANNUAL MONITORING SYSTEM CERTIFICATION <br />