Laserfiche WebLink
PLAN FIELD <br /> (7) Leakage through defective internal heating coils controlled: <br /> • Steam returns and exhaust lines from internal heating coils ❑Yes ❑No ❑NA ❑Yes❑No ❑NA <br /> that discharge into an open watercourse are monitored for <br /> contamination, OR <br /> • Steam returns and exhaust lines pass through a settling ❑Yes ❑No DNA ❑Yes❑No DNA <br /> tank, skimmer, or other separation or retention system <br /> (8) Each container is equipped with at least one of the following for ❑Yes [:]No ❑NA ❑Yes [—]No [:INA <br /> liquid level sensing: <br /> • High liquid level alarms with an audible or visual • Direct audible or code signal communication between container gauger <br /> signal at a constantly attended operation or and pumping station; <br /> surveillance station,or audible air vent in smaller • Fast response system for determining liquid level(such as digital <br /> facilities; computers,telepulse,or direct vision gauges)and a person present to <br /> • High liquid level pump cutoff devices set to stop monitor gauges and overall filling of bulk containers;or <br /> Flow at a predetermined container content level; a Regularly test li uid level sensing devices to ensure proper operation. <br /> (9) Effluent treatment facilities observed frequently enough to detect ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> possible system upsets that could cause a discharge as described in <br /> §112.1(b) <br /> (10) Visible discharges which result in a loss of oil from the container, Yes allo. NA ❑Yes 0No NA <br /> including but not limited to seams, gaskets, piping, pumps, valves, <br /> rivets, and bolts are promptly corrected and oil in diked areas is <br /> promptly removed <br /> (11) Mobile or portable containers positioned to prevent a discharge as ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> described in§112.1(b). <br /> Mobile or portable containers (excluding mobile refuelers and other ❑Yes ❑No ❑NA ❑Yes —]No DNA <br /> non-transportation-related tank trucks)have secondary containment <br /> with sufficient capacity to contain the largest single compartment or <br /> container and sufficient freeboard to contain precipitation <br /> 112.8(d)1112.12(d)Facility transfer operations, pumping,and facility process <br /> (1) Buried piping installed or replaced on or after August 16, 2002 has ❑Yes ❑No NA ❑Yes EINo DNA <br /> protective wrapping or coating <br /> Buried piping installed or replaced on or after August 16, 2002 is ❑Yes ❑No ❑NA —]Yes ❑No [INA <br /> also cathodically protected or otherwise satisfies corrosion protection <br /> standards for piping in 40 CFR part 280 or 281 <br /> Buried piping exposed for any reason is inspected for deterioration; ❑Yes ❑No DNA ❑Yes ❑No ❑NA <br /> corrosion damage is examined; and corrective action is taken <br /> (2) Piping terminal connection at the transfer point is marked as to origin ' Yes No EINA LJYes LJNo DNA <br /> and capped or blank-flanged when not in service or in standby <br /> service for an extended time <br /> (3) Pipe supports are properly designed to minimize abrasion and []Yes No ❑NA ❑Yes No DNA <br /> corrosion and allow for expansion and contraction <br /> (4) Aboveground valves, piping, and appurtenances such as flange ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> joints, expansion joints, valve glands and bodies, catch pans, <br /> pipeline supports, locking of valves, and metal surfaces are <br /> inspected regularly to assess their general condition <br /> Integrity and leak testing conducted on buried piping at time of [:]Yes [:]No ❑NA [:]Yes ❑No DNA <br /> installation, modification, construction, relocation, or replacement <br /> (5) Vehicles warned so that no vehicle endangers aboveground piping ❑Yes [—]No DNA ❑Yes ❑No DNA <br /> and other oil transfer operations <br /> Comments: <br /> 112.8(c)(2)- CONTAINMENT NOT IMPERVIOUS, AS DEMONSTRATED BY 11/24/2018 DISCHARGE. <br /> 112.8(c)(6) - STI SP001 ED. 5 WAS CURRENT EDITION WHEN SPCC PLAN WAS PREPARED, AND ONLY COVERED <br /> SHOP-BUILT TANKS UP TO 50,000 GALLONS. FIELD-ERECTED TANKS REQUIRE TESTING BEYOND UT ONLY <br /> (INTERNAL INSPECTIONS REQUIRED). <br /> Onshore Facilities(Excluding Oil Production) Page 13 of 14 June 2014 <br />