My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
1340
>
1900 - Hazardous Materials Program
>
PR0519595
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 11:25:44 AM
Creation date
3/28/2019 11:21:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0519595
PE
1921
FACILITY_ID
FA0007099
FACILITY_NAME
DURAFLAME WEST
STREET_NUMBER
1340
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14530012
CURRENT_STATUS
01
SITE_LOCATION
1340 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC TIER II QUALIFIED FACILITY APPLICABILITY-40 CFR 112.3(g)(2) <br /> The aggregate aboveground oil storage capacity is 10,000 U.S. gallons or less AND ❑Yes DNo <br /> In the three years prior to the SPCC Plan self-certification date, or since becoming subject to the rule(if the <br /> facility has been in operation for less than three years),the facility has NOT had: <br /> • A single discharge as described in§112.1(b)exceeding 1,000 U.S. gallons, OR ❑Yes [:]No <br /> e Two discharges as described in§112.1(b)each exceeding 42 U.S. gallons within any twelve-month period' Dyes ❑No <br /> IF YES TO ALL OF :• QUALIFIEDSEE ATTACHMENT D •• TIER 11 QUALIFIED <br /> REQUIREMENTS FOR PREPARATION AND IMPLEMENTATION OF A SPCC PLAN-40 CFR 112.3 <br /> Date facility began operations: 2004 AS DURAFLAME <br /> Date of initial SPCC Plan preparation: UNKNOWN Current Pian version(date/number): DECEMBER 2016 <br /> 112.3(a) For facilities(except farms), including mobile or portable facilities: <br /> • In operation on or prior to November 10, 2011: Plan prepared and/or amended and fully ❑Yes QNo [:]NA <br /> implemented by November 10,2011 <br /> • Beginning operations after November 10, 2011, Plan prepared and fully implemented ❑Yes ❑No DNA <br /> before beginning operations <br /> For farms(as defined in§112.2): <br /> • In operation on or prior to August 16, 2002: Plan maintained, amended and ❑Yes ❑No DNA <br /> implemented by May 10,2013 <br /> • Beginning operations after August 16, 2002 through May 10, 2013: Pian prepared and ❑Yes ❑No ❑NA <br /> fully implemented by May 10, 2013 <br /> • Beginning operations after May 10, 2013: Plan prepared and fully implemented before ❑Yes [:]No DNA <br /> beginning operations <br /> 112.3(d) Plan is certified by a registered Professional Engineer(PE)and includes statements that the DYes [:]No DNA <br /> PE attests: <br /> • PE is familiar with the requirements of 40 CFR part 112 ❑Yes [-]No DNA <br /> • PE or agent has visited and examined the facility QYes ❑No DNA <br /> • Plan is prepared in accordance with good engineering practice including consideration DYes [:]No DNA <br /> of applicable industry standards and the requirements of 40 CFR part 112 <br /> • Procedures for required inspections and testing have been established ❑Yes ❑No [INA <br /> • Plan is adequate for the facility []Yes [:]No DNA <br /> PE Name: William S. Seckler [License No.: 24044 State: CA Date of certification: 12/19/2016 <br /> 112.3(e)(1=avab <br /> lable onsite if attended at least 4 hours per day. If facility is unattended, Plan is DYes DNo DNA <br /> the nearest field office. <br /> e nearest field office contact information in comments section below.) <br /> Comments: <br /> 112.3(a) - NO RECORD OF FORMER/SUPERSEDED PLAN TO VERIFY DATE OF COMPLIANCE <br /> Oil discharges that result from natural disasters,acts of war,or terrorism are not included in this determination.The gallon amount(s)specified(either <br /> 1,000 or 42)refers to the amount of oil that actually reaches navigable waters or adjoining shorelines not the total amount of oil spilled.The entire <br /> volume of the discharge is oil for this determination. <br /> Z An owner/operator who self-certifies a Tier II SPCC Plan may include environmentally equivalent alternatives and/or secondary containment <br /> impracticability determinations when reviewed and certified by a PE. <br /> Onshore Facilities(Excluding Oil Production) Page 4 of 14 June 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.