Laserfiche WebLink
AMENDMENT OF SPCC PLAN BY REGIONAL ADMINISTRATOR(RA)-40 CFR 112.4 <br /> 112.4(a),(c) Has the facility discharged more than 1,000 U.S. gallons of oil in a single reportable discharge ❑Yes ❑No <br /> or more than 42 U.S. gallons in each of two reportable discharges in any 12-month period?3 <br /> If YES . Was information submitted to the RA as required in §1 12.4(a)?" ❑Yes [:]No ❑NA <br /> • Was information submitted to the appropriate agency or agencies in charge of oil ❑Yes [:]No ❑NA <br /> pollution control activities in the State in which the facility is located§112.4(c) <br /> • Date(s)and volume(s)of reportable discharges(s) under this section: <br /> • Were the discharges reported to the NRC5? ❑Yes 0 N <br /> 112.4(d),(e) Have changes required by the RA been implemented in the Plan and/or facility? ❑Yes ❑No ❑NA <br /> Comments: <br /> AMENDMENT OF SPCC PLAN BY THE OWNER OR OPERATOR-40 CFR 112.5 <br /> 112.5(a) Has there been a change at the facility that materially affects the potential for a discharge ❑Yes ❑ No <br /> described in§112.1(b)? <br /> If YES • Was the Plan amended within six months of the change? ❑Yes ❑ No <br /> . Were amendments implemented within six months of any Plan amendment? ❑Yes ❑No <br /> 112.5(b) Review and evaluation of the Plan completed at least once every 5 years? ❑Yes [:]No [:]NA <br /> Following Plan review, was Plan amended within six months to include more effective ❑Yes [:]No DNA <br /> prevention and control technology that has been field-proven to significantly reduce the <br /> likelihood of a discharge described in§112.1(b)? <br /> Amendments implemented within six months of any Plan amendment? ❑Yes [:]No ❑NA <br /> Five year Plan review and evaluation documented? ❑Yes [:]No []NIA <br /> 112.5(c) Professional Engineer certification of any technical Plan amendments in accordance with all ❑Yes [:]No [:1 NA <br /> applicable requirements of§112.3(d)(Except For self-certified Plans] <br /> Name: License No.: State: Date of certification: <br /> Reason for amendment: <br /> Comments: <br /> 112.5(b), (c) - COVERED IN PLAN, NOT YET REQUIRED <br /> 3 A reportable discharge is a discharge as described in§112.1(b)(see 40 CFR part 110).The gallon amount(s)specified(either 1,000 or 42)refers to the <br /> amount of oil that actually reaches navigable waters or adjoining shorelines not the total amount of oil spilled.The entire volume of the discharge is oil <br /> for this determination. <br /> "Triggering this threshold may disqualify the facility from meeting the Qualified Facility criteria if it occurred in the three years prior to self certification <br /> 5 Inspector Note-Confirm any spills identified above were reported to NRC <br /> Onshore Facilities(Excluding Oil Production) Page 5 of 14 June 2014 <br />