Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
GENERAL SPCC REQUIREMENTS-40 CFR 112.7 PLAN FIELD <br /> Management approval at a level of authority to commit the necessary resources to ❑Yes [:]No <br /> fully implement the Plans <br /> Plan follows sequence of the rule or is an equivalent Plan meeting all applicable rule [--]Yes ❑No DNA <br /> requirements and includes a cross-reference of provisions <br /> If Plan calls for faciiities, procedures, methods, or equipment not yet fully operational, ❑Yes ❑No DNA <br /> details of their installation and start-up are discussed (Note:Relevant for inspection <br /> evaluation and testing baselines.) <br /> 112.7(x)(2) The Plan includes deviations from the requirements of§§112.7(g), ❑Yes ❑No ❑NA <br /> (h)(2)and (3), and (i)and applicable subparts 8 and C of the rule, <br /> except the secondary containment requirements in§§112.7(c)and <br /> (h)(1), 112.8(c)(2),112.8(c)(11), 112.12(c)(2), and 112.12(c)(11) <br /> If YES [--]Yes ❑No ❑NA <br /> The Plan states reasons for nonconformance ,« . +.!!J�'•. <br /> • Alternative measures described in detail and provide equivalent ❑Yes ❑No ❑NA [—]Yes [:]No ❑NA <br /> environmental protection (Note:Inspector should document if <br /> the environmental equivalence is implemented in the field, in <br /> accordance with the Plan's description) <br /> Describe each deviation and reasons for nonconformance: <br /> [NIA FOR NONCONFORMANCE] <br /> COMMENTS: <br /> 112.7- MANAGER APPROVAL INFORMATION INCLUDED FOR SIGNATURE; COPY PROVIDED TO EPA NOT <br /> SIGNED <br /> - CROSS-REFERENCE IS INCLUDED, BUT REQUIRES CORRECTIONS TO BE CONSISTENT WITH REGULATORY <br /> CITATIONS (e.g., 112..7(h)-(k)) <br /> May be part of the Plan or demonstrated elsewhere. <br /> Onshore Facilities(Excluding Oil Production) Page 6 of 14 June 2014 <br />