Laserfiche WebLink
EDIGIMER-RYAN Inc. GR Job # 1720- 4467 <br /> D. Results of Testing/Servicing SWRCB,January 2006 <br /> Software Version Installed. 3 4 4 . 0 0 <br /> Complete the following checklist <br /> ® Yes ❑ o is the audible alarm operational? <br /> 0 Yes ❑ No* Is the visual alarm operational? <br /> 0 Yes ❑ No- Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> 0 Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> 0 Yes 13 No* it alarms are relayed to a remote monitoring station.is all communication equipment(e.g.modem)operational? <br /> ❑ NIA <br /> 0 Yes ❑ No- For pressurized piping systems,does the turbine automatically shut down it the piping secondary containment monitoring system <br /> ❑ NIA detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check all that apply) <br /> El Sump/Trench Sensor, 0 Dispenser Containment Sensor.Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? ry Yes; ❑ No. <br /> 0 Yes [3 No- For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e no mechanical overfill prevention <br /> 13 WA valve is installed),is the overfill warning alar visible and audible at the tank fill point(s)and operating property?If so,at what percent <br /> of tank capacity does the alar trigger? , 0 % <br /> ❑ Yes 0 No Was any monitoring equipment replaced?N yes,identify spec sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> 0 Yes ❑ No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) Product m Water If <br /> yes,describe causes in Section E,below. <br /> 0 Yes ❑ Ne Was monitoring system set-up reviewed to insure proper settings?Attach set-up reports,If applicable. <br /> LG Yes No' Is all monitoring equipment operational per manufacture's s eafications? <br /> In Section E below,describe how and when these deficlencies were or will be corrected. <br /> E. Comments: <br /> Found Some rain water inside UDC 1/2 but not enough to set off the L <br /> sensor. <br /> Monitoring System Certification Page 2 of 4 12107 <br />