Laserfiche WebLink
GETTLEURYAN INC, RECEIVEDGR Job# 1720- 4467 <br /> D. Results of Testing/Servicing JAN 18 2018 SWRCB,January 2006 <br /> Software version Installed: 344 . 00 <br /> ENVIRONMENTAL HEALTH <br /> Complete the following checklist rte,_— T�in1-r\IT <br /> ® es ❑ o Is the audible alarm operational? <br /> ❑ Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> m Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> ro r o ration? <br /> 0 Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communication equipment(e.g.modem)operational? <br /> ❑ N/A <br /> Ej Yes ❑ No For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ❑ N/A detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check all that apply) <br /> ❑D Sump/Trench Sensor: 0 Dispenser Containment Sensor.Did you confirm positive shut-down due to leaks and sensor <br /> fail u re/d iscon necton? r& Yes, ❑ No. <br /> 0 Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill points)and operating property?If so,at what percent <br /> of tank capacity does the alarm trigger? _2.2_% <br /> ❑ Yes ® No Was any monitoring equipment replaced?If yes,identify specthc sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> o Yes ❑ No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) []Product ❑Water. if <br /> yes,describe causes in Section E,below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to insure proper settings?Attach set-up reports,if applicable. <br /> IQ Yes 1❑ No* Is all monitoring equipment operational per manufacture's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Found Some rain water inside UDC 1/2 but not enough to set off the L <br /> sensor. <br /> Monitoring System Certification Page 2 of 4 <br /> 12/07 <br /> 2 <br />