Laserfiche WebLink
®6frriFa-RrAa kc. GR Job# 1720- 4467 <br /> SWRCB,January 2006 <br /> F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes ❑ o Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> m Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑ No' Was accuracy of system products level readings tested? <br /> m Yes ❑ No' Was accuracy of system water level readings tested? a 'r <br /> ❑+ as ❑ No- Were all probes reinstalled properly? <br /> Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? JAN 701 <br /> In the Section H,below,describe ow an en Viese e e ene es were 0771 be co . <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. ENVIRONMENTAL HEALTH <br /> Complete the following checklist q1 n"> 77 n r <br /> Yes ❑ o or equipment start-up or anrZal equipment certrtication,was a leak simulated verify pe rmance (check a <br /> ❑ N/A that apply) Simulated leak rate: 0 3 g.p.h. ❑ 0.1 g.p h ❑ 0.2 g.p.h. <br /> ® Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus property calibrated? <br /> ❑ Yes ❑ No' For Mechanical LLDs,does the LLD restrict product flow 0 it detects a leak? <br /> ® N/A <br /> ® Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ® Yes ❑ No- For electronic LLDs,does the turbine automatically shut off d any portion of the monitoring system is disabled or <br /> ❑ N/A Disconnected? <br /> 0 Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑ N/A fails a test? <br /> ® Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ® Yes ❑ No' 1were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and n these deficiencies were or will be corrected. <br /> G. Comments: <br /> Monitoring System Certf kation Page 3 of 4 12f07 <br /> 3 <br />