My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 1:29:09 PM
Creation date
3/28/2019 2:24:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by <br /> 0 <br /> BP Products North America, Inc. <br /> PO Box 6038 <br /> Artesia, CA 90702 <br /> February 2, 2018 <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue <br /> Stockton, CA 95205 <br /> (209)468-3420 <br /> Attention: Stacy Rivera <br /> Subject: Notice of Violation <br /> Facility#02186 <br /> 3212 N. California St. <br /> Stockton,CA 95204 <br /> Dear Inspector Stacy Rivera, <br /> This letter is in response to the amended Inspection Report, dated 01/04/2018, which was issued to the <br /> subject facility. The following describes the violations you noted during your inspection as well as <br /> corrective actions taken: <br /> 109 — UDC 5/6 was repaired August 2016 and six month testing was due by February 2017. <br /> Testing has not been completed and is past due. <br /> On 12/26/2017, BP testing and maintenance vendor, Gettler-Ryan, Inc., performed secondary <br /> containment testing on UDC 5/6. The test successfully passed. A copy of the test report is <br /> enclosed herein for your review and records. <br /> 120—A penetration fitting was replaced in UDC 5/6 under permit#SR0074967 in August 2016 <br /> and the UST Certification of Installation/Modification has not been submitted. <br /> On 02/02/2018, BP vendor, Belshire Environmental Services, Inc., uploaded the UST Certification <br /> of Installation/Modification form to CERS. The form was completed and signed by Gettler-Ryan <br /> for the aforementioned work done to UDC 5/6. A copy of the CERS submittal is enclosed herein <br /> for your review and records. <br /> 209 — The designated operator failed to visually inspect the 87 master fill sump for leaks, <br /> water, or debris during the May 2017 monthly inspection. The work order for the L6 (87 <br /> master fill sump) fuel alarm indicated that the liquid in the sump was removed by the facility <br /> and the technician did not open the sumps. <br /> On 01/03/2018, during the UST Monitoring System Certification, Gettler-Ryan technicians <br /> opened and inspected the 87 master fill sump. A copy of the UST Monitoring System <br /> Certification is enclosed herein for your review and records. <br />
The URL can be used to link to this page
Your browser does not support the video tag.