Laserfiche WebLink
i <br /> Mr. Jeffrey Wong <br /> February 17, 2003 <br /> Page 2 <br /> SCOPE OF WORK <br /> The scope of work will consist of three main tasks: <br /> Task 1.0 Pre-Field Activities <br /> • Secure subcontractors and complete subcontract agreements. <br /> • Coordinate site work with Zacky Farms. <br /> • Update the site-specific HASP prior to performing the fieldwork. <br /> • Obtain a City of Stockton encroachment permit for work at well <br /> MW-6, located in the Navy Drive right-of-way. <br /> • Visit and mark the site for Underground Service Alert (USA) and <br /> call USA at least 48-hours prior to drilling. <br /> Task 2.0 Field Work <br /> • As required by the encroachment permit, setup appropriate <br /> traffic control measures for work at well MW-6. <br /> • Perform a utility clearance in the vicinity of each monitoring well <br /> to locate potential utility conflicts. <br /> • Cut back the overgrowth of oleander bushes from around wells <br /> MW-4 and MW-5 to allow drill rig access. Place the trimmings <br /> in an on-site dumpster. <br /> • Break out each well vault_box and drill out each monitoring well <br /> using 10-inch diameter augers. <br /> • Abandon each borehole with neat cement grout. Patch the <br /> asphalt at well MW-6. <br /> • Dispose of the PVC well materials in an on-site dumpster. <br /> Task 3.0 Reporting <br /> • A well abandonment report will be prepared and submitted to <br /> Safeway, Zacky Farms, and the SJCEHD. The report will be <br /> reviewed and signed by a registered geologist. <br /> • GeoTrans will complete the required Department of Water <br /> Resources (DWR) well abandonment forms and forward the <br /> forms to the drilling subcontractor for signature. GeoTrans will <br /> distribute the signed forms to the appropriate parties. <br /> GeoTrans,,.. <br />