My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
3500 - Local Oversight Program
>
PR0544300
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 4:12:50 PM
Creation date
4/2/2019 3:23:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544300
PE
3528
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
02
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA 4 <br /> - - ��. GEORGE DEUKMEJIAN,Governor <br /> CALIFORNIA REGIONAL WATEfi QUALITY CONTROL BOARD— <br /> CENTRAL VALLEY REGIONJ`` <br /> 3443 ROUCIER ROAD <br /> SACRAMENTO,CA 95827-3098 <br /> 14 January 1988 <br /> i <br /> Mr. Gregory Fletcher <br /> Kayo Oil Company <br /> P.O. Box 190 <br /> Lodi, CA 95241 <br /> PROBLEM ASSESSMENT REPORT DUE DATE EXTENSION, (800 E T�HICHWAY <br /> 12,_LODI <br /> Your site consultant, Mr. Dave Ellis of du Pont, informed me by <br /> phone on 12 January 1988 that all1drilling, except monitor well <br /> 33P, will commence at 800 East Hi4hway 12 by next week. The <br /> additional drilling should take about one week with well <br /> recovery, sampling and laboratory analyses another four weeks. <br /> DuPont intends to run some short term pump and slug tests to <br /> determine the best location for the bioremediation wells, then <br /> the PAR will be completed and submitted. Based on the above time <br /> table, we agree to your request to extend the PAR due date from <br /> 25 January to 14 March: 1988. <br /> Mr. Ellis agreed that, should monitor well 11 continue to show <br /> detectable levels of contamination, an additional well or wells <br /> will be necessary to the north and west of MW 11. Monitor well <br /> 33P, in the vineyard, cannot be drilled until dry weather <br /> returns. We recommend 'that 33P be drilled as soon as possible <br /> and the results be included as an- addendum to the PAR when the <br /> irionitor-wellA-has"been-completed-and-samples have7been analyzed." <br /> If you have any questions, please call me at (916) 361-5731. <br /> i <br /> GARY S. JOHNSON <br /> Engineering Geologist <br /> GSJ:gj <br /> cc: his Laurie Cotulla, San Joaquin Local Health Distract, <br /> Stockton <br /> I L . <br /> t p <br />
The URL can be used to link to this page
Your browser does not support the video tag.