Laserfiche WebLink
I <br /> stirrers etc. if no power I�is available at the site; brass tubes y <br /> for split spoon sampler. Exceltech is to get VOA bottles from <br /> Canonie Laboratories. Dry ice will be needed to freeze selected <br /> I <br /> core samples. <br /> 2 . Site Survey. To include X,Y, and Z of all existing wells, <br /> paved areas of adjacent parts of Kett eman Lane and Lower <br /> Sacramento Road, on-site building, air stripper, pond, drainage <br /> ditches, and existing fences. New wells are to be added to this <br /> survey after drilling. Tie to a local benchmark and to Kayo' s <br /> I± <br /> site map. <br /> 3 . Locality Map Show all properties and building types within <br /> �s <br /> at least a 300 ' radius ofl�the site. We suggest this should be <br /> done on a scale of 111 :50 ' Derive from tax assessor' s maps? <br /> 4 . Permits. Obtain a1lEnecessary permits for well drilling and <br /> construction operations. .,Be sure to check with Laurie Cotulla. <br /> Permits should include any needed fo aquifer testing, water <br /> disposal from aquifer tests, and dis osal of cuttings. Submit <br /> �5 <br /> required well and boring drawings to regulatory authorities with <br /> IR <br /> copies to Kayo and Du Pont. Provide supervision by registered <br /> geologist as required by state when monitoring wells. <br /> Provide the geologists name and certInstalling <br /> fication number to Du Pont <br /> in advance. <br /> 5. Drill , sample and complete -monitoring wells. A list of wells <br /> i! <br /> � is attached, and approximate locations <br /> to be drilled or replaced <br /> are shown on the attache6: map. At least three new 4" monitor <br /> i <br /> 2 <br /> E <br /> .i <br /> i� <br /> li <br />