My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
3500 - Local Oversight Program
>
PR0544300
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 4:12:50 PM
Creation date
4/2/2019 3:23:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544300
PE
3528
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
02
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wells must be installed. They are d signated on the accompanying map <br /> E; <br /> as 22P, 23P, and 24P. Additional wells may placed in the <br /> adjacent vineyard. They 'are shown a 29P, 30P, and 31P. Exact <br /> r locations will be staked by the Du Pont representative in the <br /> field. All well construction should be done according to State <br /> of California regulationsE'Iand Du Pon 's attatched well <br /> construction specifications. All we is should have traffic rated <br /> boxes and locking covers.; The wells should have at least 8" <br /> clearance between the well cap and the top of the lock box. A T <br /> I� <br /> joint with a screw cap willl be installed on some wells to allow <br /> later access for injection piping. rhose wells will also need a <br /> PVC pipe run through a knockout in tie side of the box. <br /> 4 <br /> Steam clean all relevantparts of ri , augers, sampling equipment <br /> ,4 <br /> before drilling or adding new auger -oints. Obtain and describe <br /> split spoon samples every, five feet. Exceltech's geologist is to <br /> provide standard descriptions for st to and local reporting, and <br /> for reporting to Du Ponta Complete �11 monitor wells as 4" <br /> �i <br /> wells. No solvents or glues may be used during any part of the <br /> well construction or installation. omplete with PVC slotted or <br /> 0 <br /> wire wrapped screen. Assume 0. 020 slot size unless otherwise <br /> notified. Wells will bercreened fr:)m approximately 40' -501 . <br /> The Du Pont geologist onpsite may mo ify the screened interval <br /> based on geological conditions encou tered in the well. Submit a <br /> brief report to Du Pont summarizing the construction and the <br /> logging of all wells, to be signed b Exceltech' s registered <br /> geologist. <br /> 3 <br /> Cr <br /> R <br />
The URL can be used to link to this page
Your browser does not support the video tag.