My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
3500 - Local Oversight Program
>
PR0544300
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 4:12:50 PM
Creation date
4/2/2019 3:23:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544300
PE
3528
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
02
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A T--joint with a screw cap will be installed on wells to allow <br />' ly <br /> y later access for possible injection tubing. <br /> 8 . Electric Logging of Selected Wells. To be determined in <br /> i� <br /> consultation with Kayo. <br /> 9. Aquifer Testing. Aqullifer testing will be done in accordance <br /> �f <br /> with Du Pont's pump test protocols, as modified by site specific <br /> Ij <br /> considerations.. Existingl wells MW-1 , MW-15, and MW-14 will be <br /> used for aquifer testing." Several piezometers will probably need <br /> to be inserted for aquifer testing, and later removed. Time will <br /> be allowed for the aquifer, to stabilize after reinstallation of <br />' Iy <br /> 'E <br /> the wells, before any aquifer testin begins. The water level in <br /> the wells should be measured for two days immediately preceding <br /> f <br /> the pump testing. The day before testing, a stepped drawdown <br /> test will be run to evaluate the efficiency of the wells, their <br /> maximum flow rate, and the most appropriate pumping rate for the <br /> actual test. <br /> Aquifer testing data should be collected and stored using an <br /> electronic data logger and calibrated pressure transducers in the <br /> observation wells. Electric water level tapes should be <br /> available on site in case either the data logger or transducers <br /> fail during through the aquifer test <br /> We presently anticipate doing two aquifer tests at Lodi. The <br /> first would be to check for natural Interconnection of local <br /> hydrologic zones 3 and 5. Well MW-1 should be cleaned out and <br /> 5 <br /> Ij <br /> r, <br /> I, <br />
The URL can be used to link to this page
Your browser does not support the video tag.