Laserfiche WebLink
II r 11 <br /> Michael Hansen - 2 - December 14, 1987 <br /> Il <br /> V <br /> additional assessment. If this contingency plan is approved now by <br /> you and by the necessary regulatory author ties, we could save the <br /> time which would be needed for a second round of regulatory approvals. <br /> The contingency plan would be� to drill and sample wells at the <br /> locations marked on the attached map as MW 34P, MW-35P, MW-36P, <br /> MW-37P, and MW-38P. <br /> I <br /> We do not anticipate at this time that any or all of the <br /> contingency wells will be needed, and will consult with Kayo before <br /> drilling more than the two wells proposed n paragraph two. <br /> I <br /> ,t Sincerely, <br /> David E. Ellis <br /> Operations Manager <br /> Attachments <br /> I: <br /> F li <br /> k ., <br />