Laserfiche WebLink
gloom <br /> SAMPLING INFORMATION SHEEN' <br /> Client: ' j '^f}CDh1 D �v _ Project No: - <br /> Weil <br /> Site: 2-� G) � } C3esignation: vY1 t,v- <br /> Lap/ , <br /> Purging Equipment: 2" disposable bailer <br /> 2" PVC bailer Submersible pump <br /> 4" PVC bailer Dedicated bailer <br /> Sampled with disaosal bailer: Teflon Bailer: <br /> Well Diameter: 2" 4- V $~ <br /> Purge Vol. Multiplier: 0.163 0.357 0.563 1.47 2.61 gaUft• <br /> initial Meaaurmem qft-nar a Measurement <br /> Time: Time: Calculated Purge: � <br /> Depth of weii:*A. Depth to water: Actuai purge: <br /> Depth to water: <br /> Meter Calibration Tema. E.C. pH Turbidity <br /> Date Initial reading <br /> Time Adjusted reading <br /> Start purge Sampling time: Sampling Date: y1 � <br /> 40, "lime Tema. E.C, pH Turbidity Volume <br /> Sample appearance: <br /> aC samples collected at this well: Lack: — <br /> Eauiprnent.repiacea: iChecx all t;at appsyl Note candition of reptaeed ice• <br /> 2" Locking Cap: Lock #2357: t�r <br /> 4" Locking Can: Lack #3753: <br /> Remarks: <br /> �r' \Qr� 77 \. , <br /> review <br /> Signature <br /> V <br />