Laserfiche WebLink
SAMPLING INFQRMA'[TON SHEET <br /> Ciiern: r # Project No: -7� <br /> Site: 2�{ "77 "' ,tt Weil Designation: 1—r <br /> LODI <br /> Purging Equipment: Z" Disposable bailer X <br /> 2" PVC bailer Submersible pump <br /> 4" FVC bailer Dedicated bailer <br /> Samoled with disposal bailer: Teflon Bailer: <br /> Well Diameter: 2" _ 3" _ 4' 6" 8' -- <br /> Purge Val. (Multiplier: 0.163 0.367 0.653 1.47 2.61 gallft- <br /> Initial MessurrnerYt Recnar a Measurement <br /> Time: Time. Calculated purge- <br /> Depth of well: Depth to water:_ Actual purge. _„ <br /> Depth to water: <br /> Tern <br /> Meter Calibration mo. E.C. pH Turbiditl► <br /> Date Initial reading <br /> Time Adjusted reading <br /> Sampling time: i Sampiing pats: <br /> Start purge: <br /> Time Tema. B.C. 1 PH Turbidity Vakmw <br /> 10 <br /> I <br /> Sample appearance: ZIA <br /> QC samples collected at this well: Lock: <br /> �-- <br /> Equipment-replaced: (Cheer. ari tris[ apply? Nate canditian a1 replaced item. <br /> 2" Locking Cap: Lock #2357: ,r <br /> 4" Locking Cam hock #3753: � <br /> Remarks: <br /> - v cam`. <br /> Review <br /> Signature <br /> .J <br />