Laserfiche WebLink
Page <br /> SWRCB, MAY 2002 <br /> 5. SECONDARY PIPE TESTING �Ytndustr Standard 71 Professional Engineer <br /> PTest <br /> Method Developed by: � Piping Manufacturer 5TIndustry <br /> Other(Specify) <br /> Pressure <br /> Vacuum � Hydrostatic <br /> Method Developed by: Other(Specify) <br /> Test Equipment Used: PRESSURE GAUGE <br /> Equipment Resolution: d psi <br /> Piping Run#� Piping Run# qPiping Run# Piping Run# 2 p g <br /> F F <br /> Piping Material: y ,y fi <br /> M <br /> Piping Manufacturer: „ <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: cJ u• r <br /> �c �SeL <br /> Method and location of "��OD <br /> piping-run isolation: �G J 007Y <br /> Wait time between applying <br /> pressure starting test: �,� <br /> Aw <br /> Test Start Time: S•S S� .S 5 G <br /> Initial Reading(Ri) DDa�-+ 830 <br /> Test End Time: S S tG� d• 10.5 <br /> Final Reading(RF): / �j 0.0 s <br /> Test Duration: G�p .$1 O ' <br /> Change in Reading(Ri-IL): b_d . C7 <br /> Pass/Fail Threshold or Criteria: pASS C1 FAIL PASS FAIL PASS FAIL <br /> TEST RESULT: PASS FAIL <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) r <br /> ell /sa ee / <br /> OW Z �iv <br /> 1 <br /> U N _ i �` <br />