My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1995 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO 1995 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 11:14:19 AM
Creation date
4/10/2019 2:22:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995 - 2002
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page of <br /> WACB, MAY 2002 <br /> i. PIPING SUMP TESTING [3 Industry Standard professional Professional Engineer <br /> Sump Manufacturer <br /> '[lest Method Developed by: � Other(Specify) Vacuum f'Hydrostatic <br /> - Pressure <br /> Test Method'. ❑ Other(Specify) <br /> Equipment Resolution: •05 gph <br /> Test Equipment Used: VMI Sump# <br /> Sump# <br /> Samp# Sump#3 <br /> Sump Diameter <br /> Sump Depth `S FFr be r /cis <br /> Sump Material: <br /> ill <br /> Height from Tank Top to Top of <br /> Highest piping Penetration: <br /> Height from Tank Top to Lowest /S �'s �o <br /> Electrical-Penetration: D D <br /> Condition of sump prior to testing- <br /> portion <br /> estingPortion of sump Tested: <br /> Does turbine shut down when sump <br /> season detects either product or wateO <br /> Turbine shutdown response time: <br /> is system programmed for <br /> fail-safe shutdown? <br /> Was failsafe verified to be <br /> O <br /> operational? <br /> Wait time between applying g p ressure/ <br /> vacuum/water&starting test: <br /> Test Start Time: ys Fo0w.l <br /> initial Reading(R.) p <br /> Test End Time: 1 g y <br /> Final Reading(RF): S 7S QTS <br /> Test Duration: 0-0 <br /> Change in Reading(F--Rh)= 10'r-1 Py DS <br /> Pass!Fail Threshold or Criteria: EAIL <br /> PASS <br /> PASS ❑FAIL PASS []FAIL PASS 0 FAIL <br /> Yes No�]NA Yes(�No 0 NA <br /> TEST RESULT: No Ej NA [3 Yes C]No NA O. <br /> Was sensor removed for testing? Yes Yes( ❑No Q NA (0Yes C3 No C1 NA <br /> Was sensor properly replaced& Q Yes No [3 NA (3 Yes Yes No <br /> verified functional after testing? NA <br /> d �K, for failed tests) <br /> its made prior to testing; and reconwwade f° <br /> Comments—(include information on repo <br /> /�•�► /� <br />
The URL can be used to link to this page
Your browser does not support the video tag.