Laserfiche WebLink
11/07/2002 11:32 20946P433 FIFTH FLOOR PAGL 05 <br />SAMPLING PROTOCOL FOR ROUTINE PIPINGIDISPENSER REMOVAUREPLACEMENT <br />The following represents minimum sampling criterion required for closure compliance. 5011 samples collected shall t: <br />representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. <br />contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted with; <br />five (b) working days pursuant to eaorornia Health & Safety Code, Section 25295. <br />DISPENSER SAMPLES <br />AT LEAST ONE SAMPLE BELOW EACH DISPENSER <br />PIPING AND STOCKPILE <br />Sample every 20 lineal feet <br />Samples every 50 cubic yards <br />4 <br />