My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 11:42:03 AM
Creation date
4/10/2019 2:41:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feb 05 03 02:29p E]'nn Hathaway (531 755-1950 p.3 <br />Page 2 of <br />NRCB, MAY 2002 <br />. SEC4ND , PIPE TESTING professional Engineer <br />(� piping Manufacturer Industry Standard <br />Test Method Developed by: Other (Specify) Hydrostatic <br />Vacuum <br />Test Method DeveloPressureped by: Q Other (Specify) <br />_ I psi <br />GAUGE Equipment Resolution: <br />Test Equipment Used: PRESSURE Piping Run piping Run # <br />Piping Run # Piping Run # <br /># <br />,4e <br />piping Material: <br />piping Manufacturer: <br />/ <br />piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Mcthod and location of <br />pip"g_run isolation: <br />Wait time between applying <br />S <br />pressure starting test: <br />Test Start Time: <br />Initial Reading (R) <br />Test End Time: <br />Final Reading (R►): <br />D <br />Test Duration: <br />Change in Reading (R`, - R,)* <br />� Q PASS [� FA'L <br />Pass l Fail Threshold or Criteria: <br />U FAIL <br />FAIL PASS 1J FAL PASS <br />❑ <br />PASS <br />TEST RESULT: <br />testingand recommended follow-up for faded tests) <br />— (include information on repairs made prior to , <br />Comments <br />
The URL can be used to link to this page
Your browser does not support the video tag.