REVISIONS BY
<br /> TONY REM
<br /> San Joaquin County
<br /> ..c.
<br /> Environmental Health Department
<br /> <` 1868 E. Hazelton Ave. SCULLERY AND GREASE TRAP
<br /> •% Stockton, CA 95205
<br /> RP (209) 468-3420
<br /> �lFOR
<br /> APPROVED WITH CONDITIONS ADDITION
<br /> Cf)
<br /> For conditions, please see approval letter dated: 4-3-19 w
<br /> � �
<br /> C��rt:e-uv- Date:Apr 03, 2019 C)Approved by:
<br /> w 0
<br /> w = Q
<br /> 3008co
<br /> HAMMER LANE T E 12
<br /> U
<br /> 3
<br /> z
<br /> W -5
<br /> T 5
<br /> KT N A 2 7
<br /> Q O 0
<br /> PHONE : 209-487-4786
<br /> L
<br /> U �
<br /> CONSULTANTS z
<br /> PROJECT SCOPE OF WORK GENERAL NOTES SHEET INDEX w NCo
<br /> PLUMBING NOTES: W o o
<br /> CONTRACTOR FURNISH AND INSTALL ON ALL MATERIAL AND LABOR TO GIVE A W CO M
<br /> �
<br /> COMPLETE AND OPERATING SYSTEM TO THE OWNER FOR THE FOLLOWING SYSTEMS ALL WORK SHALL CONFORM T❑ THE FOLLOWING CODES: PLUMBING MECHANICAL ENGINEER Z c ,� 0,�
<br /> L
<br /> aU0 �
<br /> AND STRUCTURES: 2016 CBC z O O
<br /> 1. FURNISH AND INSTALL ONE 750 GALLON GREASE TRAP FOR THE PROJECT. 2016 CPC GDMD Engineering, Inc. 0 U N J LL.M E
<br /> 2. FURNISH AND INSTALL 1 WATER HEATER WITH GAS LINE FOR NEW SINK. 2016 CEC 2016 CMC PO COVER SHEET 2723 Tejon St 0 `V a 0)
<br /> 3. FURNISH AND INSTALL 1 HANDWASH SINK AND 1 3 COMPARTMENT SINK. POA SCHEDULES, DETAILS, AND NOTES Lodi Ca 95242 0 � E
<br /> CONTRACTOR SHALL KEEP ALL INSTALLATI❑N INSTRUCTI❑NS FOR PLUMBING FIXTURES, ACCESS DOORS,
<br /> ALL WORK IS REQUESTED TO BE PERFORMED BY OWNER/LEASEE. OWNER/LEASEE SEALING
<br /> ITRMATERIAL, FIREIR STOPPING, ETC. ONSITE IN WATERPROOF POUCHES FOR THE INSPECTING P1 FLOOR PLANS Phone: 209-367-0899 w
<br /> CARRY$1,000,000 LIABILITY INSURANCE,W/$1,000,000 AGGREGATE, $1,000,000
<br /> WORKERS COMP AND SHALL NAME OWNER OF BUILDING ET.AL.AS ADDITIONAL PLUMBING CONTRACTOR SHALL SUBMIT 7 SETS OF SUBMITTALS FOR REVIEW AND COMMENT BY THE Fax: 209-367-0898
<br /> INSURED. ENGINEER AND ARCHITECT OF RECORD FOR THE FIXTURES LISTED AND THE MATERIAL To BE USED
<br /> AND INSTALLED ON THIS PROJECT AND SHALL MAKE THE APPROPRIATE CHANGES AS DIRECTED BY
<br /> DEFERRED APPROVAL THE ENGINEER AND ARCHITECT AT NO ADDITI❑NAL COST TO THE OWNER,
<br /> 1. THERE ARE NO DEFERRED APPROVALS, NO ELECTRICAL NOR FIRE SPRINKLER
<br /> WORK. MATERIALS:
<br /> COLD AND HOT WATER
<br /> TYPE 'L' COPPER ABOVE GROUND AND TYPE 'K' BELOW, FURNISH SHUTOFF VALVES WHERE SHOWN,
<br /> SHUT OFF VALVES SHALL BE BALL TYPE WITH TEFLON SEATS, STAINLESS STEEL BALL, AND
<br /> DOUBLE O-RING STEM 1/4 TURN, VALVES TO BE RATED FOR WOG SERVICE, PR❑VIDE DIELECTRIC
<br /> UNIONS AT ALL DISSIMILAR METAL CONNECTIONS, INSULATE HOT WATER SUPPLY AND RETURN LINES
<br /> W/1" FIBERGLASS ASJ MEETING THE REQUIREMENTS OF T-24 MANDATORY FEATURES,
<br /> SCH 40 CPVC BELOW GRADE OUTSIDE, SIZE AS INDICATED ON THE DRAWINGS, CONTRACTOR SHALL co
<br /> COORDINATE HIS WORK WITH OTHER TRADES, CONTRACTOR SHALL DISINFECT WATER LINES PER AWA N
<br /> GUIDELINES AND PR❑VIDE THREE COPIES FROM AN INDEPENDENT TEST LAB, WATER SHALL BE
<br /> TESTED FOR WATER BORNE BACTERIUM, SPORIDIUM AND OTHER PATHOGENS AT THE TIME OF Lii
<br /> OCCUPANCY AND CERTIFY THE SYSTEM PASSED THESE TESTS,
<br /> TEST WATER LINES AT 1.5 TIMES WORKING PRESSURE FOR LEAKS NOT TO EXCEED 100 PSIG. HOLD U
<br /> PRESSURE FOR 24 HOURS, - z
<br /> LU
<br /> SEWER AND RWL'S - ABS PIPE AND FITTINGS ABOVE AND BELOW GRADE, CI PIPE WITH z
<br /> ESCUTCHEONS WHERE PROHIBITED BY CODE AND THE LOCAL JURISDICTI❑N, CLEAN❑UTS SHALL BE J Q O
<br /> PROVIDED EVERY 100 FT AND AT EACH CHANGE OF DIRECTI❑N GREATER THAT 909, USE OF ABS w J LL
<br /> PIPE IS LIMITED TO BUILDINGS 2 OR LESS STORIES IN HEIGHT AND CANNOT BE USED WITHIN FIRE
<br /> RATED ASSEMBLIES, ALL SEWER LINES SHALL BE SLOPED AT A MINIMUM OF 1/4" PER 1 . O
<br /> LINES -- SEE SEWER LINES, CVENT U
<br /> HVAC CONDENSATE DRAIN LINES - TYPE 'M' COPPER PIPE AND FITTINGS INSIDE BUILDING AND SCH w
<br /> 40 PVC PIPE OUTSIDE BUILDING, PR❑VIDE CLEANOUT AT EACH CHANGE OF DIRECTI❑N AND AT C❑IL z z
<br /> C❑NNECTI❑N, SLOPE LINES AT 1/8" PER 1'. w = 0
<br /> TEST SS AND RWL DRAIN LINES PER SECTION 723,1 AND 1106,2,2 RESPECTIVELY. TEST CONDENSATE FL: UJ
<br /> DRAIN LINES USING SECTI❑N 1106,22 C) = U
<br /> w
<br /> GAS � Q
<br /> 5 PSI SERVICE - 2-1/2" AND SMALLER SHALL BE SCH 40 GI SCREWED PIPE AND FITTINGS, 3"
<br /> AND LARGER SHALL BE SCH 40 WELDED PIPE AND FITTINGS, EXPOSED PIPE SHALL BE GALVANIZED, C53
<br /> VICINITYMAP BURIED PIPE SHALL BE COVERED WITH X-TRU COAT, ALL PIPE INSIDE BUILDING SHALL BE WELDED,
<br /> 7" WC SERVICE - SCH 40 GALVANIZED IR❑N PIPE AND FITTINGS OUTSIDE BUILDING AND SCH 40
<br /> BLACK IR❑N PIPE INSIDE BUILDING, PAINT WHERE EXPOSED TO INTERI❑R FINISHES,
<br /> TEST 7-11" WC GAS AND LPG LINES USING AIR AT 15 PSIG. OBSERVE FOR 24 HOURS FOR LEAKAGE.
<br /> TEST ALL GAS LINES WITH HIGHER PRESSURES THAN 11" WC AT 1,5 TIMES WORKING PRESSURE, CONAL
<br /> °ed
<br /> a.efbYpdLP6 MINIMUM PRESSURE OF 50 PSIG, H❑LD TEST FOR 24 HOURS, �5 F�
<br /> FIXTURES
<br /> ROUGH IN ALL ACCESSIBLE FIXTURES PER THE DETAILS FOUND IN CBC CHAPTER 11, THE a
<br /> ARCHITECTURAL DRAWINGS AND LOCAL CODE REQUIREMENTS, NOTIFY ARCHITECT IN WRITING OF
<br /> N0. M29759 Q
<br /> LOCATION ❑F
<br /> PROPERTY CONFLICTS, REN. 6-30-20
<br /> EXISTING BUILDING DATA —
<br /> � SUBMITTALS F �
<br /> " ..��
<br /> PROVIDE SEVEN SETS ❑F SUBMITTALS FOR REVIEW, OF C P�-��
<br /> °.�r�b, UNCHANGED
<br /> INSTALLATI❑N
<br /> BRACE ALL PIPE AND DUCT SYSTEMS PER SMACNA SEISMIC RESTRAINT GUIDELINES INCLUDING
<br /> ° �M °'.0 CHANGES OF DIRECTION AND CHANGES IN ELEVATION ❑F MORE THAN 10'. OCCUPANCY GROUPS: B,A-3
<br /> DRAWN
<br /> CPVC INSTALLATI❑N TYPE OF CONSTRUCTION: VB NR
<br /> INSTALLATI❑N OF CPVC FOR NEW AND REPLACEMENT SYSTEMS MUST COMPLY WITH THE CHECKED
<br /> REQUIREMENTS AS STATED IN CHAPTER 6 AND INSTALLATI❑N STANDARDS IAPM❑ IS-20-2005, ALL FIRE SPRINKLERED: YES, EXISTING GD
<br /> PROCEDURES MUST BE FOLLOWED FOR FLUSHING AND WORKER SAFETY MEASURES, INCLUDED ARE EXISTING OCCUPANCIES: UNCHANGED DATE
<br /> THE PENALTIES AS STATED ON CHAPTER 6 (g), ANY CONTRACTOR OR SUBCONTRACTOR FOUND TO 03-26-19
<br /> HAVE FAILED TO COMPLY WITH THE VENTILATI❑N GLOVE OR FLUSHING REQUIREMENTS OF SECTI❑N SCALE
<br /> 1.2.2 OF APPENDIX I OF THIS CODE, INSTALLATI❑N STANDARDS FOR CPVC SOLVENT CEMENT HOT AND AS NOTED
<br /> COLD WATER DISTRIBUTION SYSTEMS. IAPMO IS-20-2005 SHALL BE SUBJECT To THE PENALTIES ON PARKING SPACES EXISTING: UNCHANGED
<br /> HEALTH AND SAFETY CODE, DIVISION 13, PART 15 CHAPTER 6 SECTI❑N 17995. JOB N0.
<br /> TENANT PARKING: EXISTING 2019-030
<br /> IN ADDITION IF DURING THE CONDUCT OF ANY BUILDING INSPECTION, THE BUILDING OFFICIAL FINDS SHEET
<br /> THAT THE VENTILATION AND GLOVE REQUIREMENTS OF SECTI❑N 1,22 OF APPENDIX I OF THIS CODE, C.B.C: 2016
<br /> SPECIAL REQUIREMENTS FOR CPVC INSTALLATION WITHIN RESIDENTIAL BUILDINGS ARE BEING
<br /> VIOLATED, BUILDING OFFICIAL SHALL CITE THE CONTRACTOR OR SUBCONTRACTOR FOR THE ADDRESS: 3008 E HAMMER LANE
<br /> VI❑LATI❑N UNDER THE CALIFORNIA PLUMBING CODE. STOCKTON, CA 0
<br />
|