My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24323
>
2900 - Site Mitigation Program
>
PR0537557
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:16 PM
Creation date
4/17/2019 3:00:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537557
PE
2950
FACILITY_ID
FA0021623
FACILITY_NAME
JAHANT FOOD AND FUEL
STREET_NUMBER
24323
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00516019
CURRENT_STATUS
01
SITE_LOCATION
24323 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> f <br /> TL 392-0061-01 Page 11 <br /> allow for the safe removal and decontamination of personal <br /> a <br /> protective equipment that ,may have'. been required..: <br /> 1. Boots and gloves will be.�washed with trisadium phosphate <br /> (TSP) detergent and., tap water, then rinsed before: <br /> removal ; <br /> 2. Boot covers .and oVerall's will. be removed and coveralls <br /> placed in a plastic bagfor appropriate disposal; :. <br /> i <br /> 3. Gloves will then be removed and, placed in the ;plastic '. <br /> bag: hands wxll be washed with soap and.. water; rind <br /> 4,: Spent protective clothing will be stored tin-site in ;55- <br /> ballon strums and properly disposed of after receipt of <br /> lab. atry analysis: <br /> Y <br /> C 5..6` peraga R660oonsa:ble fox Health and Safety at Site: ; .. <br /> Twinings project geologist, Mr» Ken Janes will. be the designated , <br /> site safety officer. The project gbol.ogist"s responsibilities will <br /> i <br /> f�de imple. 10 tion of; the site safety work plan for Twining <br /> personnel involved with field operations. Mr. Jones. has completed <br /> 40-Hour OSHA Health and .Safety Training as required by 2`9 CFR. <br /> r <br /> 1.310,120. , <br /> The project safety officer, Mr. Art Morr.11.1 will oversee the <br /> k <br /> administration of the site: safety work plant. Mr.. Merrill has , <br /> completed 40--Hour CSH Health and;Safety Training, 8:-Hour Update,. <br /> and 8-Hour: SupervigorsHealth .and Safety Training as required by <br /> 29 .CFR. 1:9:10.1.2..0:: <br /> _ 6.0: PF�f?«THCT: SCHE.n_U:I►L <br /> 'Drilling activities are planned to begin after approval of <br /> this work plan... and appropriate €permits. :are obtained from.. the <br /> The= estimated time' to complete: the dri llin <br /> SJCPHS�EHi�: � P gand <br /> * Fresno Modesto. Utsaha Bakersneid <br />
The URL can be used to link to this page
Your browser does not support the video tag.