Laserfiche WebLink
TL 3:92--0061-.a1 <br /> Page 12 <br /> sampling phase Is sine day, Taboratclry reports should be available <br /> . <br /> within two weeks of :914bmitfal Of P01' 1 samples. Preliminary verbal <br /> result$, Of. gasoline and diesel analytes will be <br /> ly,, five to ;:seven 6mittal <br /> available in. approximate clays followinq: su ,, <br /> Of sOfls. S..&M es. t the laboratory technical report will <br /> o The, e <br /> tollOV 4pp"ximately four weeksaft6. r completion, of the laboratory A <br /> analyses. The total estimated time! to complete the proposed scope <br /> .of work is apptoximately six weeks! from the date the drilling is <br /> completed:. <br /> 7.0 _PROJE.dT TZ M <br /> Mr: Arthur H. Morrill: will 'be project man Mr, <br /> -M age.r. <br /> Jotzes wi11 be the presject. geologist: Mr.. Jeff 1< le-wyn w.j. . bo <br /> the <br /> a n aly....t Mr. Clay Rodgers,acal chemist Cal3for is <br /> R stared Geologist t RG). :Will provide technical, direction and: <br /> Regi ere. <br /> review. <br /> Twining assumes. that ,dri-Iling,I I location will be... accessible.. to: <br /> a trUck-mounted drill ria: at the time of our field.:operat ions. 'The <br /> costs necessary to make. the `location accessible will be billed at <br /> cost plus 15 per cent to Mr- Singh. A minimum of' 25-feet of <br /> overhead clearance is required abo'vle the location of the proposed <br /> hollow stem augersail boring. IfIWthe presence of undergtound or <br /> overhead utility service prevent drilling, the soil borings may be <br /> q. <br /> relocated or drilled on an angle. Relocation and/or angle drilling <br /> Fresno Modesto Visalia Bakersfield <br />