Laserfiche WebLink
GENESIS ENGINEERING&REDEVELOPMENT <br /> 5.12 Implementation Schedule <br /> Upon approval from the DTSC for this draft RAW,the public participation plan will be <br /> implemented. In accordance with the Community Profile prepared for the Site, the following <br /> additional activities will be conducted. <br /> 1. A fact sheet will be sent out to the Site mailing list describing the Site and the <br /> proposed removal action; <br /> 2. The length of the public review and comment period will be 30 days; <br /> 3. A public meeting or workshop will be held if there is sufficient community interest; <br /> and <br /> 4. Site documents will be available in electronic format on DTSC's publicly <br /> accessible EnviroStor database. <br /> Once the public comment period is completed, DTSC will review and respond to the <br /> comments received. The RAW will be revised,as necessary,to address the comments <br /> received. If significant changes to the RAW are required,the RAW will be resubmitted for <br /> public review and comment. If significant changes are not required,the modified RAW will <br /> be approved for implementation by DTSC. <br /> Within sixty days after DTSC approval of the final RAW,the Remedial Design("RD")will <br /> be submitted for DTSC approval. The RD will detail the technical and operational plans for <br /> implementation of the final RAW including: <br /> 1. Description of equipment used to excavate, handle, and transport contaminated <br /> material; <br /> 2. A field sampling and laboratory analysis plan addressing sampling during <br /> implementation and to confirm achievement of the performance objectives of the <br /> RAW; <br /> 3. A transportation plan identifying routes of travel and final destination of wastes <br /> generated and disposed; <br /> 4. An updated health and safety plan addressing the implementation activities; <br /> 5. Identification of any necessary permits and agreements; and <br /> 6. A detailed schedule for implementation of the remedial action consistent with the <br /> schedule contained in the approved RAW including procurement, mobilization, <br /> construction phasing, sampling,transportation, and disposal. <br /> Upon DTSC approval of the RD,the final RAW will be implemented in accordance with the <br /> approved schedule in the RD. <br /> Former Gordon Research Company Property 18 of 20 <br /> Removal Action Workplan <br /> June 2017 <br />