GENESIS ENGINEERING&REDEVELOPMENT <br /> control measures are to be employed during the remediation. Truck drivers will have Class <br /> A licenses. <br /> Soil stockpiles will be located on the eastern part of the Site, adjacent to the entrance gate on <br /> South Union Road. Based on the volume of soil to be removed(700 yd3, approximately I <br /> ton per yd3), and dump truck capacity of about 30 tons, it will take approximately 25 <br /> truckloads to remove all impacted soil. During loading,trucks will be parked on-Site to <br /> avoid inhibiting traffic on South Union Road. After loading and before leaving the Site, <br /> trucks will be decontaminated by removing visible soil according to a Dust Mitigation Plan <br /> (Appendix F). Manifest records will be maintained for transportation and disposal of the <br /> waste. <br /> 5.9 Site Restoration <br /> Because the volume of soil to be excavated from each AOC (i.e. less than 250 yd3)and <br /> shallow excavations (less than 1.5 feet deep),minimal Site restoration will be performed as a <br /> part of the RAW. No clean fill will not be brought in to backfill each AOC. Vertical walls <br /> of an excavation greater that are 6 inches high will be regarded to a 1:1 slope. The Site will <br /> be redeveloped after a No Further Action determination has been received from DTSC. Soil <br /> re-grading activities during Site redevelopment will fill/cut excavations as necessary to bring <br /> them to the proposed Site grade. <br /> 5.10 Domestic Well Abandonment <br /> The on-Site domestic well will be abandoned in accordance with San Joaquin County <br /> Environmental Health Department regulations. There is little information available about the <br /> construction of the domestic well. Prior to destruction,the well materials will be inspected <br /> from the surface, and the total depth of the well will be determined. Abandonment will <br /> consist of perforation of the entire length of screen and casing, followed by pressure grouting <br /> with a cement/bentonite grout. The upper 2.5 feet of casing will be removed and grout used <br /> to backfill the hole to 6 inches above the casing, and the remainder of the hole backfilled <br /> with native material. <br /> 5.11 Site Safety Plan <br /> The Health and Safety Plan(Appendix D)provides details regarding safety measures that <br /> will be followed during remedial activities. <br /> Former Gordon Research Company Property 17 of 20 <br /> Removal Action Workplan <br /> June 2017 <br />