Laserfiche WebLink
SMTM <br /> INSTALLING UL LISTED RED THREAD II <br /> PRODUCT PIPE LINES <br /> A <br /> T.A.B. JOINING SYSTEM — This exclusive TA.B, tapers can be joined with factory installed threaded TA.B. <br /> ,Threaded and Bonded)Joint is factory installed. It is the Joint coupled ends. Either factory-made TA.B.spigc <br /> standard joining system for UL Listed RED THREAD II or field-made tapers may be joined with belled fittings. For <br /> pipe. Spigot and bonded-on couple ends are threaded proper tapering, carefully follow the operating instructions <br /> with special profile double-lead threads.Combined with included with the tapering tool kit. <br /> adhesive at time of assembly.TA.B.Joint promotes JOINING PROCEDURE — 1.Clean spigot and coupled <br /> positive makeup and prevents backout during cure.TA.B. ends using the joint cleaner included in adhesive kit.After <br /> Joint is fast and easy to use. a surface is cleaned,do not touch or otherwise contam- <br /> -ompatible fittings are also listed by Underwriters inate it with dirt. <br /> Laboratories for underground handling of petroleum 2.Apply thoroughly mixed adhesive to both surfaces. <br /> products. See pages 5 and 6 for fittings configurations. 3. Insert the spigot into the coupled end using a turning <br /> HANDLING AND STORAGE — RED THREAD II pipe is motion ...joint must lock. <br /> packaged in compact bundles of four to eight lengths. ADHESIVES— The adhesive kits required for use in <br /> Bundles of RED THREAD II pipe can be safely stored on handling petroleum products are Smith Fiberglass <br /> level ground or on racks with 10-foot(or less) support DS-7014, DS-7024, DS-7054, DS-7069.(21 These kits have a <br /> spacing. Reasonable care must be used in handling RED 25 minute working life at 75'F. However, curing time of the <br /> TH READ I I pipe. Do not drop or throw RED TH READ II adhesive on an assembled joint is dependent on the <br /> pipe on the ground.or drop stones or other heavy objects ambient temperature. Heat assist methods to shorten cure <br /> r It. times are recommended for ambient temperatures below <br /> CUTTING — RED THREAD 11 pipe is easily cut with an 70°F. Smith Fiberglass has developed two methods of <br /> ordinary hacksaw, using a fine-toothed blade. For ease of supplying the necessary heat to bond pipe joints. For <br /> tapering,the cut end should be square as possible. particulars, refer to the Smith Fiberglass Installation <br /> Instructions. <br /> TAPERING — When RED THREAD II pipe is cut to <br /> length on the job site,the cut end must be retapered.The All adhesive kits contain epoxy resin and hardener in <br /> field tapering tool pictured below is used for this purpose. separate containers,joint cleaner, mixing stick, paint brush <br /> Adaptable to two-,three-, and four-inch pipe. the tool and paper towels.A detailed instruction sheet is included. <br /> quickly applies the proper taper by a shaving operation— Following these instructions will insure easy,fast assembly <br /> similar to a pencil sharpener. Plain unthreaded field-made of RED THREAD I I pipe. <br /> i <br /> f <br /> Quant. Approx.No.`ot bonds/kit <br /> FIELD TAPERING TOOL Mixed <br /> KII i Adhesive 2" 3'_; 4"" + <br /> DS-7014 6.8 oz. 25 18 10,E <br /> DS-7024(Twin Pack) 2.5 oz.ea. -18 to <br /> •+ — + DS-7054(Sag Kit) 1.6 oz- 6 <br /> DS-7069(2)- J 9.950Z____'1' <br /> (1)For addi;inal information on cutting,tapenng and pining procedures refer to Smith <br /> Fiberglass Installation Instructions <br /> (2)Not recommended for most 2',3'and 4'installations because of large quantity of <br /> adhesive per kit <br /> PR <br /> ti •" .; � -x.., -� ..x,r <br /> r- af.tm.... 'a"1$..:;ya>i3�`..".uw-1wr ,.-� �.•..3i*Z�. raw�. <br />