Laserfiche WebLink
Mr. Eric Trevena <br /> RE: Beacon Station #696 <br /> November 10, 1994 <br /> Page Two <br /> These improvements will greatly enhance our ability to detect and subsequently <br /> repair any potential leak points at the top area and especially along the <br /> manhole. These improvements will cost us an additional $40,000 that was not <br /> budgeted to this project initially. <br /> As you are aware, this project is already under construction and on a <br /> "fast-track" schedule. I trust that you agree that these improvements are <br /> necessary and do not add substantially to the original "re-ppipe" scope of <br /> work. Indeed, the tank slab will probably be demolished by the time you <br /> receive this letter. Does this work require any type of amendment to our <br /> permit? Obviously, we intend on performing all the tests on these tanks, <br /> including sump water tests, fill and vapor bucket water tests, full systems <br /> tank and line tests, pressure decay and blockage tests, soap tests, etc. <br /> Please let me know if you need any additional information. Thank you for your <br /> time and attention towards this project. I can be reached at (209) 583-3342. <br /> Very truly yours, <br /> J INC. <br /> C_tr-v <br /> Paul C. /Ject <br /> Senior PEngineer <br /> Enclosures <br /> PCC/mas <br />