My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1994 PIPING
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
INSTALL 1994 PIPING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2022 4:58:51 PM
Creation date
4/26/2019 2:34:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994 PIPING
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ w .� <br /> OPW s IOR Series of Emergency Shut-Off Valves Offer <br /> Reliability, Security, Versatility' and Peace of Mind <br /> OPW has designed features into every 1OR. Emergency causing the valve to close, thereby reducing the <br /> Shut-Off Valve to help protect your site investment gasoline spillage. <br /> and the environment against fire, explosion, personal <br /> injury, property damage, and contamination in the OPW's 1OR Series offers a variety of models to choose <br /> event of a dispenser"knockdown". Upon dislocation, from, adding convenience, affordability and easy <br /> the OPW IOR is designed to break at the shear groove. installation to an already extensive list of benefits. <br /> When properly installed, the top section shears off, <br /> i' <br /> The OPW TORP The Low Profile/ The Versatility of the <br /> Double Poppet Valve Combination Body IOR. Series <br /> ♦ Double poppet construction ♦ Double poppet construction ♦ Three different top connection <br /> offers added security by offers added security by styles. <br /> reducing spillage from the capturing spillage from the <br /> dispenser and underground dispenser and underground ♦ Two double poppet style <br /> piping. piping. options. UL <br /> ♦ The first poppet contains ♦ Low profile makes the ♦ Over 75 different UL Listed <br /> petroleum from underground 1OR Series ideal for new standard variations. <br /> piping; the second retains construction or retrofit. ♦ Can be custom designed for <br /> gasoline already in the ♦ Upgrades to double poppet any application." <br /> dispenser. <br /> models are easier because the <br /> ♦ Top assembly main poppet TORP internally threaded and <br /> seating assures a new union connection low profile <br /> seating surface with each body's size is equal to standard <br /> replacement. single poppet height. <br /> ♦ Exclusive bridge design in ♦ The combination body ensures <br /> secondary poppet reduces added installation versatility <br /> pressure drop for efficient and security. <br /> flow rate. <br /> ♦ Two mounting options allow <br /> ♦ Pressure relief valves help U-bolt or stabilizer bar <br /> reduce pressure in the installation. <br /> dispenser in the event of a U <br /> fire after the valve shears. • UL Listed. c,L <br /> ♦ UL Listed. UL O `Custom-desi;n models ma} not be UL Listed. <br /> 91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.