My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1994 PIPING
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
INSTALL 1994 PIPING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2022 4:58:51 PM
Creation date
4/26/2019 2:34:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994 PIPING
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW 10RP Double Poppet Valves <br /> OPW TORP Double Poppet Emergency Shut-Off Valves <br /> Are The Right Choice For"All The Right Reasons. <br /> Three Top <br /> Connection Styles <br /> Thermal Relief Valve <br /> d <br /> Secondary Poppet <br /> Shear Groove Hold-Open Bridge <br /> O <br /> Overall Height: <br /> - 61/4" <br /> ' Main Poppet ("F"Style) <br /> Combination Body-► <br /> mow:- •U-Bolt <br /> •Stabilizer <br /> • OPW's double poppet technology • Hold-open bridge allows the • Three top connection styles that <br /> makes the TORP unsurpassed in fuel to flow more quickly and are interchangeable with any <br /> the industry. efficiently during normal body style. <br /> • Top seated main poppet extends operation. <br /> • Easily changeable tops to convert <br /> valve life by a. .-urin easily • Superior construction materials, single poppet valves to double <br /> accessed inspection and a including a Duragard'coating, poppet design. <br /> new seating surface at each for extra corrosion protection. <br /> replacement. • Main poppet is out of flow path. • Low profile design. <br /> • In the event of a hreaka«av • Two built-in mounting options. <br /> the thermal relief vdvv helps to • Four U-bolt points for superior <br /> prevent s;stem prf;pure build up security. • UL Listed. UL <br /> due to thermal rxpan�1011. <br /> OPW <br />
The URL can be used to link to this page
Your browser does not support the video tag.