My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1994 PIPING
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
INSTALL 1994 PIPING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2022 4:58:51 PM
Creation date
4/26/2019 2:34:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994 PIPING
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spedficafions <br /> The Advantage' MPD' Elevation Diagram <br /> �-- 53-13116' f 31-5116'—►{ <br /> 49-1/12" 21 <br /> —� 1 --+�_ <br /> -- - ----- -i <br /> j 9-12' <br /> ____ <br /> Canopy�`i - <br /> 42' 23518 <br /> 95-316' <br /> O O O <br /> o gd• <br /> 88-7/8• <br /> 60" <br /> Detail A <br /> ————— 16, 24-34"23" (smn <br /> 22' 25-1/4" 21-12" ��IN"r�•t:"d'1 <br /> Deta6 A <br /> 1 25.1/4' <br /> 21.12' •Add 2'For Setl-Contained Pumps <br /> 48' 32-y8• <br /> Standard Units <br /> 36-1/8' <br /> Vapor Recovery lhvts <br /> (Husky V.R.Uses Start Nn72fe Hooks) <br /> The Advantage MPD Dispenser Foundation Diagram <br /> 48' <br /> Opening For 1' 4 42' <br /> Vapor Recovery Pipe 4 21•—04 21' <br /> (4)3/4 x1-1/2' 16-1/2'—►;4 16-1/2' (3)1-1/2'Supply Unions <br /> Slots For Anchor Bolts 13 5/8'►49 1/4•� (2-7/16'Up From Base) <br /> ♦ I <br /> 9-1/4' 8' 4-3/8' 2-1/2'► �- - 6" <br /> T.T. 12' <br /> 21-1/2' 18-1/2' - - - - 2-3/4' <br /> 5" 14-1/2' 1 <br /> — — <br /> 4 16' Opening For 1"Conduit <br /> 4 <br /> Opening For 1/2' 16' 0' (9-1/4'Up From Base) <br /> Speaker Conduit .4 19' —�!4 22-1/2" (4)13/16 x1-7/16" <br /> (Suggested Location) 4 45' 0. Slots For Anchor Bolts <br /> The Advantage MPD Pump Foundation Diagram <br /> 48' <br /> (3)1-1/2"Supply Unions 4 42• <br /> (2-7/16"Up From Base) <br /> (4)3/4 x1-1/2' 16-1/2' 16-1/2" Opening For 1/2" <br /> Slots For Anchor Bolts 16" 13' Speaker Conduit <br /> (Suggested Location) <br /> 9-1114" 8' ♦ 1-1/4'♦ 4-11/16' 6" <br /> 5-5/8" !.T. 12" <br /> - -t- - --!- - - - - - - -.�.----- -- -- ----------- <br /> 21-1/2" 18.1/2' ._ 3-1/2" 'i ♦4-15/32" <br /> 5-5/8' <br /> Opening For 1"Conduit <br /> (9-1/4'Up From Base) <br /> Opening For 1' 11-13/16' j <br /> Vapor Recovery Pipe 4— 19' —►i4— 22-1/2" 01 <br /> (4) 13/16 x1-7/16' <br /> Slots For Anchor Bolts 4 45" <br /> n <br />
The URL can be used to link to this page
Your browser does not support the video tag.