My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1994 PIPING
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
INSTALL 1994 PIPING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2022 4:58:51 PM
Creation date
4/26/2019 2:34:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994 PIPING
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spedficafionscontkucd <br /> The Advantage Dual & The Advantage Quad Elevation Diagram <br /> (` <br /> 41-13/16' 31.5/16' <br /> I <br /> 37-114' <br /> f- <br /> --- ►{1 I--Is-21'--.1 --I <br /> Canopy option <br /> 3p• 23-5IB' <br /> • O <br /> 85-3116' <br /> 94' <br /> 68-7/6' <br /> The AdvantaW DualI 6p•• <br /> Does Not Have <br /> Left Putdown Or Detail A <br /> Price-Per-Unit Module <br /> 16• 24-3/4- <br /> 25 1/4"* 21-12" N.�•�• 1 <br /> DelaN A 6.v Hom.flat) <br /> 36' �--21-1r2- -Add 2-For Se114—or1tained Pumps <br /> 32-316' <br /> Standard Units <br /> 36-1/8' <br /> Vapor Recovery Units <br /> (Husky V.R.Uses Short Nozzle Hooks) <br /> The Advantage Dual & The Advantage Quad Dispenser Foundation Diagram <br /> Opening For 1'Vapor Recovery Pipe <br /> W. 0 Dual Dispenser <br /> (1 or 2)1-112'Supply Unions 21--D Less This Supply Union <br /> (2-7/16'Up From Base) <br /> t 10'�4 <br /> 121-471A <br /> 0' (4)3/4 x1 1/2' <br /> Slots For Anchor Bolts <br /> 7-5/8' y 1_4i/:81� <br /> ' 6' I <br /> 21-1/2" 18-1/2" 16" '-T- - - - - •- - -- -. ._-.T-.T_M12' <br /> 15' <br /> 3-1/4' <br /> Opening For 1"Conduit <br /> Opening For 1/2' 8-1/2'x— 16-1/2" <br /> Speaker Conduit <br /> (Suggested Location) 33' <br /> (4)13/16 0-7/16" -4 36' <br /> Slots For Anchor Bolt <br /> The Advantage Dual & The Advantage Quad Pump Foundation Diagram <br /> (2)1-1/2"Supply Unions <br /> (2-7/16"Up From Base) 30' 0 Dual Pump <br /> (4)3/4 xt 1/2" 21" 111, Less This Supply Union <br /> Slots For Anchor Bolts ► 8-3/8" <br /> ♦ <br /> 5-5/8' 5-7/32" 6" 1 <br /> -�- - - - - V .T.12' <br /> 21-1/2' 18-1/2" 16" 3-1/2' ♦ <br /> ♦ 5" 4-7/32' <br /> I <br /> Opening For 1'Conduit <br /> Opening For 1"- Vapor Recovery Pipe 8-1/2'x4 12-1/8' 1- (4) <br /> 13/16 x1-7/16' <br /> Opening For 1/2" 13" IP�— 16-1/2' Slots For Anchor Bolt <br /> Speaker Conduit t 33' <br /> (Suggested Location) -4 36' <br />
The URL can be used to link to this page
Your browser does not support the video tag.