Laserfiche WebLink
` MONITC "ING SYSTEM CERTIF'7ATION <br /> CERTIFICATION / TEST DATE: July 28, 2006 <br /> Al. FACILITY A2. OWNER <br /> Name USA Petroleum #3696 Name USA Petroleum Corporation <br /> Address 2448 W. Kettleman Ln., Lodi, CA 95242 Address 3034 N.Glacier Way, Hanford,CA 93230 <br /> Phone# 559-585-8156 Phone# 559-585-8156 <br /> Contact Sandy Edwards Contact Sandy Edwards <br /> F. IN-TANK GAUGING /SIR EQUIPMENT: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all Input wiring been inspected for proper entry and termination,Including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No" Were all Items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No` For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ NIA (check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No' I Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ NIA or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off If any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> This is a Monitoring Certification of the 89 annular sensor only. <br /> C 2006 Walton Engineering,Inc. <br /> Page 3 of 3 <br />