Laserfiche WebLink
nitoring System Certification <br /> Site Address: 2448 W KETTLEMAN LN Date of Testing/Service: 05/30/2006 <br /> @ LOWER SACRAMENTO RD <br /> D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Complete the following checklist: <br /> Yes ❑No Is the audible alarm operational? <br /> 0 Yes ❑No Is the visual alarm operational? <br /> ❑ Yes No Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes No <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> ❑ ' <br /> interfere with their proper operation? <br /> ❑ Yes ❑No' x N.,A If alarms are relayed to a remote monitoring station, is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑x Yes ❑No ❑N/A monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ❑x Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks aad sensor failure/disconnection? ❑x Yes ❑ No <br /> ❑ Yes ❑No ❑NA For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.: no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? <br /> ❑ Yes- ❑x No Was any monitoring equipment replaced?If yes, identify specific sensors, probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E, below. <br /> ❑ Yes' ❑x No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> ❑ Water. If yes,describe causes in Section E, below. <br /> ❑x Yes ❑No' Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> ❑ Yes ❑x No' Is all monitoring equipment operational per manufacturers'specifications? <br /> In Section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> UNABLE TO REMOVE 89 ANNULAR SENSOR TO VERIFY OPERATION. CABLE BROKE. <br /> CALLED IN TO MAINT FOR REPAIRS <br /> Page 2 of 3 Based on CA form dated 03/01 <br />