My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO 2007 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 9:31:54 AM
Creation date
4/29/2019 9:19:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2009
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Re: USA Gas#68153 2448 W. Kettleman Ln. Lodi, CA 95242 SR0057987 <br /> 5. Any changes shall be submitted to the San Joaquin County Environmental Health <br /> Department(EHD) for approval prior to commencing work. All new addenda supersede <br /> the previous ones. <br /> 6. Contact Aris Cacapit(468-3453)to arrange the following inspections(a 48-hour notice is <br /> required): <br /> a. Secondary Containment test(or equivalent)on all three fill sumps. <br /> b. Functionality of all three annular sensors was verified to pass on 11-17-09 with <br /> Inspector Michelle Henry. <br /> c. Hydrostatic test of all three spill containers was witnessed to pass on 11-17-09 <br /> with Inspector Michelle Henry. <br /> d. Secondary containment test of all three tanks was witnessed to pass on 11-17-09 <br /> with Inspector Michelle Henry. <br /> 7. Since concrete was broken near all three UST fill sumps, a tank and fill sump secondary <br /> containment test(or equivalent) must be performed, once concrete is poured in <br /> accordance with the manufacturer's guidelines. Results must be received by EHD within <br /> seven days of returning the facility to operating condition. <br /> 8. An "Underground Storage Tank Certification of Installation/Modification" form shall be <br /> submitted by the owner or the owners'agent [pursuant to (CCR)2635(d)]before this <br /> upgrade will be considered complete by EHD. <br /> If you have any further questions,please contact me at(209) 468-3453, fax to (209) 468- <br /> 3433 or email to acacapit@sjcehd.com <br /> Thank you, <br /> Aris Cacapit <br /> Registered Environmental Health Specialist <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.