Laserfiche WebLink
FEB-20-2008 09:04 Service Station Systems 408 938 8888 P.10 <br /> - � s <br /> 10. SPILIJOVERFILL CONTALNMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes [I <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: 0 Spill Bucket Manufacturer X industry Standard ❑Professional Engineer <br /> ❑ Other(Specijt) <br /> Test Method Used: p Pressure ❑Vacuum N Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: lncon Sump Tester Equipment Resolution: +/.0.002" <br /> Fill Spill Box#91 Vapor Spill Box#91 <br /> 1!!Bucket Diameter: 11*1 11" <br /> Bucket Depth: 10" 11" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 rain. 10 min, <br /> starting test: <br /> Test Shut Time: 3:43 pm 3:16 prn <br /> Initial Reading(Rt): 4.2875 7.4133 <br /> Test End Time: 3:59 pm 3:32 pm <br /> Final Reading(RF): 4.2874 7.4184 <br /> Test Duration: 16 min. 16 min. <br /> Change in Reading(RF-R,): -0.0001 I +0.0001 <br /> Pass/Fail Threshold or +/-0.002" +/-0.002" <br /> Criteria: <br /> Test Result.. ® Pass Fail M Pass Tail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> TOTAL P. 10 <br />