Laserfiche WebLink
FEB-20-2008 09:04 Service Station Systems 408 938 8888 P.09 <br /> 9. SPILL/OVERFILL CONTAINMENT ROXE,S <br /> Facility is Not Ecluipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer M Industry Standard ❑Professional Engineer <br /> Q Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hvdrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Incon Sump!ester Equipment Resolution: +/-0.002" <br /> A <br /> Fill Spill Box#87 Vapor Spill Box#87 Fill Spill Box#89 Vapor Spill Box#89 <br /> Bucket Diameter: 11" 11" l 1" 1 l" <br /> Bucket Depth_ 10" 1 1" 10" 11" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min. 10 min. 10 min. 10 min. <br /> starting test: <br /> Test Start Time: 2:27 pm 2:27 pm 2:27 pm 2:27 pm <br /> Initial Reading(R,): 4.3239 6.7192 6.4245 7.8276 <br /> Test End Time: 2:42 pm 2:42 pm 2:42 pm 2:42 prn <br /> Final Reading(RF): 4.3243 6.7194 6.4246 7.8277 <br /> Test Duration: 15 min. 15 min. 1.5 min. 15 min. <br /> Change in Reading(RF-Rt): +0.0004 +0.0002 +0.0001 +0.0001 <br /> Pass/Fail Threshold or <br /> Criteria: +/-0.002" +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: O Pass Fail El Pass Fail © Pass Fail © Pass Fail <br /> Comments— (include infonnation on repairs made prior to testing, and recommended follow-up for failed tests) <br />